Laserfiche WebLink
<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />site is not located in an area that is known to recharge <br />the ground water system. <br /> <br />C. Substantially alter the existing drainage pattern of the <br />site or area, including through the alteration of the <br />course of stream or river, or substantially increase the <br />rate or amount of surface runoff in a manner, which would <br />result in flooding on or off-site? <br /> <br />D. Create or contribute runoff water which, would exceed the <br />capacity of existing or planned stor.m water drainage <br />systems or provide substantial additional sources of <br />polluted run-off? <br /> <br />L. Result in increased impervious surfaces and associated <br />runoff? <br /> <br />M. Create a <br />drainage <br />volumes. <br /> <br />significant adverse environmental impact to <br />patterns due to changes in runoff flow rates or <br /> <br />Less Than Significant Impact <br /> <br />The project site is located within an urbanized area with <br />improved drainage facilities. Based on a preliminary <br />analysis of drainage conditions and facilities on the <br />project site and surrounding area, the City's Public Works <br />Department has indicated that it is feasible that existing <br />drainage facilities within the project area would be able <br />to adequately drain the proposed project. <br /> <br />F. <br /> <br />Place housing within a 100-year floodplain, as mapped <br />on a federal Flood Hazard Boundary or Flood Insurance <br />Rate Map or other flood hazard delineation map? <br />Place housing within a 100-year floodplain, as mapped <br />on a federal Flood Hazard Boundary or Flood Insurance <br />Rate Map or other flood hazard delineation map? <br />Place within a 100-year floodplain structures which <br />would impede or redirect flood flows? <br /> <br />G. <br /> <br />H. <br /> <br />No Impac t <br /> <br />According to the Flood Rate Insurance Map 0602320029F, the <br />project site is located within Flood Zone X and not subject <br />to 100-year flood risks. Implementation of the proposed <br />project would not increase the risk of flooding. <br /> <br />14 <br /> <br />75tr~~ß8 <br />