<br />One Broadway Plaza Project Mitigation Monitoring Program <br /> <br />TABLEt <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />Mitigation Measure Implementation Responsible <br />Schedule Department <br />Land Use Measures <br />There are no significant adverse land use impacts and no mitigation is required. <br />Topo~raphy, Geology and Soils <br />G-I The design for the project will comply with all provisions of the Preliminary Geotechnical Feasibility During design, grading and Executive Director of the <br />Investigation performed by Zeiser Kling Consultants and their Addendum Recommendations, including construction. Public Works Agency <br />recommendations for grading, removal and recompaction of soils, foundations, settlement, pile (PW A)/Executive <br />foundations, design criteria, seismic design, retaining walls, ferrous corrosion, surface drainage, pavement Director of Building & <br />design, concrete hardscape, soldier pile/logging system and supplemental investigations. Planning (PBA) or his/her <br />designee. <br />G-2 Prior to acquiring a grading permit for project construction, the developer will prepare a Final Geology Prior to obtaining a grading Executive Director of the <br />and Soils Report, to specifically assess the following: permit. PW AlPBA or his/her <br />1. The shrink-swell potential of potentially expansive soils on the site; specifically addressing designee. <br />appropriate recommendations for soil treatments, grading procedures and/or foundation designs, as <br />appropriate, for the planned land use on the site. <br />11. The potential for compressible soils on the site; specifically addressing appropriate recommendations <br />for soil treatments, grading procedures and/or foundation designs, as appropriate, for the planned land <br />use on the site. <br /> <br />The recommendations from the Final Geology and Soils Report will be incorporated into the grading plan <br />for the project. <br />G-3 Prior to obtaining a grading permit for project construction, the Final Geology and Soils Report will Prior to obtaining a grading Executive Director of the <br />specifically assess grading control with special emphasis on controlling fugitive dust which could be permit. PW AlPBA or his/her <br />generated during site preparation, grading and construction. The reports will specifically provide for designee. <br />establishing procedures for dust control and monitoring so that unacceptable levels of dust do not escape <br />from the site. These dust control measures will be coordinated with the dust control measures described <br />in Section 3.4 (Air Quality). The standards and procedures developed in the reports will be incorporated <br />into the grading plan to be followed by the project developer. <br />G-4 All structures to be erected on the One Broadway Plaza site will be designed in accordance with the During design and Executive Director of the <br />seismic design provisions in the Final Geology and Soils Report and of the Uniform Building Code to construction PW AlPBA or his/her <br />promote safety in the event of such an earthquake. designee. <br />G-5 During final design, the developer will consult with the Orange County Water District and the Regional During final design and Executive Director of the <br />Water Quality Control Board, Santa Ana, regarding intrusion of foundation piles into the Orange County construction. PW A or his/her designee. <br />Groundwater Basin. The project applicant will solicit the appropriate permits and approvals from the <br />OCWD and the R WQCB for the anticipated intrusion of the foundation piles into the Groundwater Basin <br /> <br />U:\VFregosoIWP5 JIREPORTSIOne Broadway MMP.doc <br />June J 4, 2004 <br /> <br />Page 2 <br />