My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75F - ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
75F - ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:54 PM
Creation date
7/15/2004 11:29:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75F
Date
7/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />One Broadway Plaza Project Mitigation Monitoring Program <br /> <br />TABLEt <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />Mitigation Measure <br /> <br />and will incorporate measures identified by those agencies in the fmal design and construction <br />soecifications for the oro1ect. <br /> <br />W -1 Prior to the issuance of a grading permit for the project: <br /> <br /> <br />- The developer will prepare and submit a Notice of Intent (NO I) to the State Water Resources Control <br />Board (SWRCB). <br /> <br />- The developer will submit the NOI and the project Water Discharge Identification Number (WDIN) to <br />the City of Santa Ana City Engineer. <br /> <br />The developer will prepare a Stormwater Pollution Prevention Plan (SWPPP) and will submit the SWPPP to <br />the City Engineer for review and comment. The developer will maintain the SWPPP on the construction site <br />throughout the construction period. <br />W -2 During all site preparation, grading and construction, the project contractors will comply with all applicable <br />requirements of the NPDES permit, the Drainage Area Management Plan (DAMP) and the City's Local <br />Implementation Plan (LIP). The project contractors will incorporate Best Management Practices (BMPs) <br />from the DAMP and LIP and will implement those measures as appropriate during site preparation, grading <br />and construction. <br />W -3 During all site preparation, grading and construction, the construction contractors will be responsible for <br />implementing the SWPPP provisions. The SWRCB is responsible for monitoring and enforcing the <br />provisions of the SWPPP. In addition, the City Engineer will monitor and enforce these provisions during <br />all site preparation, grading and construction, as appropriate, t() ensure the SWPPP is properly <br />implemented. <br />Prior to the issuance of grading permits, the Project Developer shall provide for the review and approval of the <br />Director of Public Works a Water Quality Management Plan (WQMP) prepared for the project consistent <br />with the Orange County Drainage Area Management Plan. The WQMP shall contain provisions and BMPs <br />for both construction and operating conditions. <br />Prior to the issuance of grading permits, the Project Developer shall submit a fmal drainage plan for the <br />proposed One Broadway Plaza project for review and approval by the City Engineer. <br />Prior to the issuance of the first building permit, the Project Developer shall pay the City's drainage impact <br />fee. <br />During operation of the proposed project, the Project Owner/Operator shall ensure that all pest control, <br />herbicide, insecticide and other similar substances used as part of maintenance of project features are handled, <br />stored, applied and disposed consistent with all applicable federal, state and local regulations. The City <br />Enl.!ineer shall monitor and enforce this orovision. <br /> <br />W-4 <br /> <br />W-5 <br /> <br />W-6 <br /> <br />W-7 <br /> <br />U:\VFrego'\"o\WP5/IREPORTSIOne Broadway MMP.doc <br />June 14. 2004 <br /> <br />Implementation <br />Schedule <br /> <br />Prior to the issuance of the <br />grading permit. <br /> <br />During all site preparation, <br />grading and construction. <br /> <br />During all site preparation, <br />grading and construction. <br /> <br />Prior to issuance of the <br />grading permit. <br /> <br />Prior to issuance of the <br />grading permit. <br />Prior to the issuance of the <br />first building permit. <br />During project operations. <br /> <br />Responsible <br />Denartment <br /> <br />Executive Director of the <br />PW A or hislher designee. <br /> <br />Executive Director of the <br />PW A or hislher designee. <br /> <br />Executive Director of the <br />PW A or hislher designee. <br /> <br />Executive Director of the <br />PW A or hislher designee. <br /> <br />Executive Director of the <br />PW A or hislher designee. <br />Executive Director of the <br />PW A or hislher designee. <br />Executive Director of the <br />PBA or hislher designee. <br /> <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.