My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75F - ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
75F - ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:54 PM
Creation date
7/15/2004 11:29:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75F
Date
7/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />One Broadway Plaza Project Mitigation Monitoring Program <br /> <br />TABLEt <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> Mitigation Measure Implementation Responsible <br /> Sched ule Department <br />A Q-l 0 Where feasible utilize existing power sources (e.g., power poles) or clean fuel generators rather than During all site preparation, Executive Director of the <br /> temporary power generators. grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-ll Provide on-site power sources during the early stages of the project. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />A Q-12 Where feasible use low emission on-site stationary equipment (e.g. clean fuels). During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-13 Spread soil binders on site, unpaved roads and parking areas. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />A Q-14 Apply chemical soil stabilizers according to manufacturer's specifications to all inactive construction During all site preparation, Executive Director of the <br /> areas (previously graded areas which remain inactive for 96 hours). grading and construction. PW AlPBA or hislher <br /> designee. <br />A Q-15 Reestablish groundcovers on construction site through seeding and watering of the site that will not be During all site preparation, Executive Director of the <br /> disturbed for lengthy periods (such as two months or more). grading and construction. PW AlPBA or his/her <br /> designee. <br />A Q-16 Schedule truck deliveries and pickups during off-peak hour. During operations. Executive Director of the <br /> PW AlPBA or his/her <br /> designee. <br />A Q-l 7 Provide adequate ingress and egress at all entrances to public facilities to minimize vehicle idling at During operations. Executive Director of the <br /> curbsides. PW AlPBA or his/her <br /> designee. <br />A Q-18 Provide dedicated turn lanes as appropriate and provide roadway improvements at heavily congested During operations. Executive Director of the <br /> roadways. PW AlPBA or his/her <br /> designee. <br />AQ-19 Provide on-site services. During operations. Executive Director of the <br /> PW AlPBA or his/her <br /> designee. <br />AQ-20 Improve thermal integrity of the buildings and reduce thermal load with automated time clocks or During operations. Executive Director of the <br /> occupant sensors. PW AlPBA or his/her <br /> designee. <br />A Q- 21 Install energy efficient street and parking lot lighting. During operations. Executive Director of the <br /> PW AlPBA or his/her <br /> designee. <br /> <br />U:IVFregosolWP5 JIREPORTSIOne Broadway MMP.doc <br />June /4, 2004 <br /> <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.