Laserfiche WebLink
<br />One Broadway Plaza Project Mitigation Monitoring Program <br /> <br />TABLEt <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br />W-8 Prior to the issuance of grading permits, the City Engineer shall verify that structural BMPs have been Prior to the issuance of the Executive Director of the <br /> pennanently incorporated into project plans by the applicant. Such BMPs shall ensure that pollutants from grading permit. PW A or his/her designee. <br /> proïect-related stonn water are mitigated consistent with applicable state and local standards. <br /> Air Quality <br />AQ-I Use low-emission mobile construction equipment where feasible. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or hislher <br /> designee. <br />AQ-2 Water site and clean equipment morning and evening to comply with AQMD Fugitive Dust Measures During all site preparation, Executive Director of the <br /> BCM-03 and BCM-06. As part of the conditions of grading permit approval, the project shall water the grading and construction. PW AlPBA or hislher <br /> construction site and unpaved haul roads (with use of reclaimed water or chemical soil binder, where designee. <br /> feasible) twice daily. <br />AQ-3 Wash off trucks leaving the site to comply with AQMD Fugitive Dust Measure BCM-O!. As part of the During all site preparation, Executive Director of the <br /> conditions of grading permit approval, project construction contractors shall wheel wash construction grading and construction. PW AlPBA or hislher <br /> equipment and cover dirt in trucks during on-road hauling. This measure is already included in the designee. <br /> particulate emission projections in the report. Haul trucks leaving the site shall also have a minimum <br /> freeboard distance of 12", or cover payloads. <br />AQ-4 Sweep streets if silt is carried over to adjacent public thoroughfares. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or hislher <br /> designee. <br />AQ-5 Reduce traffic speeds on all unpaved road surfaces to IS miles per hour or less. During all site preparation, Executive Director of the <br /> grading and construction. PW A /PBA or hislher <br /> designee. <br />AQ-6 Suspend grading operations during first and second stage smog alerts. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or hislher <br /> designee. <br />AQ-7 Suspend all grading operations when wind speeds (as instantaneous gusts) exceed 25 miles per hour. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or hislher <br /> designee. <br />AQ-8 Maintain construction equipment engines by keeping them tuned. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or hislher <br /> designee. <br />AQ-9 Where feasible use low sulfur fuel for stationary construction equipment. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br /> <br />U:IVFregoso\WP5/IREPORTS\One Broadway MMP.doc <br />June /4, 2004 <br /> <br />Page 4 <br />