Laserfiche WebLink
<br />One Broadway Plaza Project <br /> <br />Mitigation Monitoring Program <br /> <br />TABLEt <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />Mitigation Measure Implementation <br />Schedule <br />Trans ortation <br />T-1 The developer shall pay all costs (design, construction, administration and inspection) for Washington At issuance of certificate of Executive Director of the <br />Avenue and 10th Street to operate as one-way streets which include signal modifications and appropriate occupancy pennit. PW A or hislher designee. <br />protected left-turn signal at Main StreetlWashington Avenue, Main Street/10th Street, Washington <br />Avenue/S camore Street, Broadwa StreetlWashin ton Avenue and Broadwa Street/10th Street. <br />T-2 The project proponent shall pay for all costs for the installation of a roundabout at the intersection of At issuance of the certificate Executive Director of the <br />S camore Street and 10th Street. of occu anc ennit. PW A or hislher desi nee. <br />T-3 The project proponent shall pay all costs to install pedestrian crosswalks and a refuge area at the intersection At issuance of the certificate Executive Director of the <br />of Sycamore Street and 10th Street where a roundabout is to be constructed. The project developer shall be of occupancy permit. PW A or hislher designee. <br />required to pay all costs (design, construction, administration and inspection) for these mitigation measures, <br />as the are art of the roundabout as stated in T-2. <br />T-4 Main Street, between 17 Street and the 1-5 ramps, shall have all on-street parking stalls and parking At issuance of the certificate Executive Director of the <br />meters removed, and Main Street shall be restriped to provide three northbound and two southbound of occupancy pennit. PW A or hislher designee. <br />travel lanes. The project proponent shall pay all costs (design, construction, administration and <br />ins ection associated with these removals and re-stri in when buildin ennits are issued. <br />T-5 Main Street, between 17 Street and Civic Center Drive, shall have all on-street parking stalls and parking At issuance of the certificate Executive Director of the <br />meters removed and Main Street shall be re-striped to provide a third northbound through lane within the of occupancy pennit. PW A or hislher designee. <br />existing right-of-way. The developer shall pay all costs associated with re-striping and removing existing <br />arkin meters. <br />T-6 The developer shall pay all costs (acquisition, design, construction, administration and inspection) for At issuance of the certificate Executive Director of the <br />rovidin southbound ri ht-turn lane at the intersection of Main Street and 17th Street. of occu anc ennit. PW A or hislher desi nee. <br />T -7 The developer shall pay all costs (acquisition, design, construction, administration and inspection) for At issuance of the certificate Executive Director of the <br />rovidin southbound ri ht-turn lane at the intersection of Broadwa Street and 17th Street. of occu anc ennit. PW A or hislher desi nee. <br />T-8 Westbound Santa Clara Avenue shall be re-striped at Broadway Street to provide one left turn lane and one At issuance of the certificate Executive Director of the <br />shared left turn/right turn lane. The project proponent shall pay all costs (design, construction, administration of occupancy pennit. PW A or hislher designee. <br />and ins ection associated with this re-stri in when ro'ect buildin ennits are issued. <br />T-9 Northbound Grand Avenue from Fruit Street to 14 Street shall be re-striped at Santa Ana Boulevard/I-5 At issuance of the certificate Executive Director of the <br />HOY ramps to provide three northbound travel lanes. The project proponent shall pay all costs (design, of occupancy permit. PW A or hislher designee. <br />construction, administration and inspection) associated with this re-striping when project building pennits are <br />issued. <br />T-lO 1-5 northbound off-ramp shall be re-striped to provide a westbound left turn lane, a shared left turn/right At issuance of the certificate Executive Director of the <br />turn lane and a right turn lane at Grand A venue. The project developer shall pay all costs (design, of occupancy permit. PW A or hislher designee. <br />ermittin , construction, administration and ins ection when buildin ermits are issued. <br /> <br />U: \ VFregosolWP5 J IREPORTSIOne Broadway MMP.doc <br />June J 4. 2004 <br /> <br />Page 7 <br />