My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75F - ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
75F - ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:54 PM
Creation date
7/15/2004 11:29:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75F
Date
7/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />T-17 <br /> <br />T-18 <br /> <br />One Broa(hvav Plaza Project <br /> <br />Mitigation Monitoring Program <br /> <br />TABLEt <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />Mitigation Measure <br /> <br />T-ll <br /> <br />A new traffic signal shall be installed at the intersection of Main Street and 15ID Street. Communications <br />cable and conduit required to connect the traffic signal to the City of Santa Ana's Traffic Signal Master <br />System shall be a part of traffic signal installation. The project proponent shall pay all costs (design, <br />construction, administration and inspection) associated with this signalization when project building pennits <br />are issued. <br />A new traffic signal shall be installed at the intersection of Santa Ana Boulevard and French Street. <br />Communications cable and conduit required to connect the traffic signal to the City of Santa Ana's Traffic <br />Signal Master System shall be a part of traffic signal installation. The project proponent shall pay all costs <br />(design, construction, administration and inspection) associated with this signalization when building pennits <br />are issued. <br />A new traffic signal shall be installed at the intersection of Sycamore Street and 15th Street. Communications <br />cable and conduit required to connect the traffic signal to the City of Santa Ana's Traffic Signal Master <br />System shall be a part of traffic signal installation. The project proponent shall pay all costs (design, <br />construction, administration and inspection) associated with this signalization when building pennits are <br />issued. <br />The project proponent shall pay the appropriate City Transportation System Improvement Fee to help <br />offset the One Broadway Plaza Projects' impact on the City of Santa Ana street system. <br />The developer should coordinate with the Orange County Transportation Authority (OCT A) to identify ways <br />to enhance transit use by tenants of One Broadway Plaza. The project developer shall install a bus stop, bus <br />transit or any other transit related improvements if requested by the OCT A. <br />The project proponent shall satisfy the relevant requirements of the City's TDM Ordinance, including <br />confonnity of site plans with facility standards specified in the TDM Ordinance, and submission and <br />implementation of a TDM strategy plan and progr <br />The project developer shall contribute to neighborhood traffic studies for the six neighborhoods evaluated <br />in Section 3.5.8 (including before and after traffic counts) in order to assess any intrusion of project traffic <br />into these neighborhoods. If traffic intrusion attributable to the project is identified, corrective measures <br />will be identified. Depending of the potential impacts, examples of corrective measures could include; <br />forced-turn channelization, semi-diverters, diagonal diverters and cul-de-sacs. If approved by the <br />neighborhoods per the City's Procedures for Neighborhood Traffic Plans, corrective measures will be <br />implemented at a maximum cost to the developer of $200,000 per neighborhood. The funds to implement <br />the improvements are directly payable to t}~_c,~jtï. ~)f Sa~~~ A.....!.~a..E~'ior .~~ !S:;,~l~1CC ~~!)ui.ldil,l.ß.l>~rmits. <br />~~~r~j~~~~~~kT§g~r~g~ entran~~~(~)(i!~ shall be designed to mcet City sight distance standards:.t: <br />!~~cap¥l~~~3IlS~: " -"'" . ....;~f thè -:iÍ1iêfšèëtîoii'öfBì-òéÌdway and' t1îê 'p~låiig ; stiuc'tuiê''é~ <br />fës1íiétle~':~'ñl?V~~~ ..<?S..~~tirig:: on;Bröadway:sùbjèêi~o the, ~ï"èw~äD4:.approv31'Qf' <br />EngiI1èér!0:The 'project "pfoponent.s ""lrpáy' all ~èô~is~assõCiàted ,'With thiS' merliaí(Priõ?:,iQ buiidm¡{~ <br />~ing isSúèd. <br /> <br />T-12 <br /> <br />T-13 <br /> <br />T-14 <br /> <br />T-15 <br /> <br />T-16 <br /> <br /> <br />U: \ VFregoso\ WP51 \REPORTSIOne Broadway MMP.doc <br />June 14. 2004 <br /> <br />Implementation <br />Schedule <br /> <br />At issuance of the certificate <br />of occupancy pennit. <br /> <br />Responsible <br />Department <br />Executive Director of the <br />PW A or his/her designee. <br /> <br />At issuance of the certificate I Executive Director of the <br />of occupancy pennit. PW A or his/her designee. <br /> <br />At issuance of the certificate I Executive Director of the <br />of occupancy permit. PW A or his/her designee. <br /> <br />At issuance of the certificate <br />of occupancy permit. <br />During construction and <br />prior to Certificate of <br />Occupancy. <br />At issuance of certificate of <br />occupancy and during <br />operation <br />At issuance of the certificate <br />of occupancy pennit. <br /> <br />Executive Director of the <br />PW A or his/her designee. <br />Executive Director of the <br />PW A or his/her designee. <br /> <br />Executive Director of the <br />PW A or his/her designee. <br /> <br />Executive Director of the <br />PW A or his/her designee. <br /> <br />At issuance of the certificate I Executive Director of the <br />of occupancy pennit. PW A or hislher designee. <br /> <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.