My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75F - ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
75F - ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:54 PM
Creation date
7/15/2004 11:29:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75F
Date
7/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PS-3 <br /> <br />PS-4 <br /> <br />PS-5 <br /> <br />PS-6 <br /> <br /> <br />Mitifwtion Monitoriní! Proí!ram <br /> <br />TABLE! <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />Mitigation Measure <br /> <br />Prior to issuance of building permits, the project developer shall submit a construction phasing plan for <br />the proposed project to the SAFD. The plan will be consistent with SAFD Fire Code requirements. Also, <br />the project developer shall provide evidence to the SAFD that the proposed fire protection services will be <br />adequate to serve the proposed project development. A fire exit shall be provided in the office building <br />along with adequate fire protection facilities and equipment to serve the proposed 37-story office building. <br />Prior to issuance of building permits, the project developer shall submit a construction phasing plan for <br />the project to the SAFD. This plan will show that emergency vehicle access to the project site is <br />adequate. Emergency access will be provided on Washington A venue and Sycamore Street. <br />The final design of the project shall include fire sprinklers in the office building and parking garage at <br />locations specified by the SAFD. The project shall also conform with all applicable SAFD fire protection <br />and access requirements. <br />The final design of the project shall include fire hydrants at locations specified by the SAFD. <br /> <br />PS-7 The project developer shall notify the SAFD and SAPD when the office building helipad is operational. <br /> <br />PS-8 <br /> <br />PS-9 <br /> <br />The project developer shall contribute a fair share amount to have an emergency vehicle preemption <br />detector placed on the existing traffic signal arm at the intersection of Broadway Street and 10th Street, <br />Broadway Street and Washington A venue and Washington A venue and Sycamore Street. These detectors <br />shall also be placed on any other traffic signal and modified as part of this project. <br />The project developer shall incorporate a repeater in the design of the project to prevent interference with <br />Police and Fire Department radio signals. <br /> <br />PS-I0 Prior to the issuance of building permits, the project developer shall submit evidence to the City of Santa <br />Ana of a fee navrnent between the develoner and the SAUSD to offset school facilitY related imnacts. <br /> <br />PS-ll <br /> <br /> <br />PS-12 <br /> <br />~Cfrin~i~~J:s~.a.~~;.~~ll#-~~.~~~~~~k~fh?~¿;j:~~~l&pætýilii~ä~~l.>.~t~~" - ~"~}¿£~~~; <br />~(J.~ÄrtS .Acadèri1y-..andDéiYls ::Elem~tarY~Sc1i09"~~~~.po~ifiè.d~b1 ~ßJ,~.j)røj~.~ÜIÞi~l. w# ,þfojt;Š! <br />fP~tÍ1ictiõÍ1~~~ègi€š~;t1ià(~~~~1~1~~~q~ê(f7~1{~ja~~~~~~~~PÞ~~~: J.. .' :tI:~~gJ~ <br />~vói4 proje~t.coi1Stiíictiori activities'~d.Closure'cjfthesid~wa1kš~ãdja'ceÏirtcithe piojeét si .'... d bý:thQ <br />PIaîuiing Commission on June) 4~.' 2004); <br /> <br />U:IVFregosoIWP5/IREPORTSIOne Broadway MMP.doc <br />June /4. 2004 <br /> <br />Implementation <br />Schedule <br />At issuance of the first <br />building permit. <br /> <br />At issuance of the first <br />building pennit. <br /> <br />During fmal design. <br /> <br />During fmal design. <br /> <br />At or after Certificate of <br />Occupancy. <br /> <br />At issuance of first building <br />pennit. <br /> <br />During fmal design. <br /> <br />At issuance of the first <br />building pennit. <br />During all site preparation, <br />grading and construction. <br /> <br />Responsible <br />Department <br />Executive Director of the <br />PBA or hislher designee <br />and SAFD. <br /> <br />Executive Director of the <br />PW A or hislher designee <br />and SAFD. <br />Executive Director of the <br />PBA or hislher designee <br />and SAFD. <br />Executive Director of the <br />PBA or hislher designee <br />and SAFD. <br />Executive Director of the <br />PBA or hislher designee. <br />SAFD and SAPD. <br />Executive Director of the <br />PW A or hislher designee, <br />SAFD and SAPD. <br /> <br />Executive Director of the <br />PBA or hislher designee, <br />SAFD and SAPD. <br />Executive Director of the <br />PBA or hislher designee. <br />Executive Director of the <br />PBA or hislher designee. <br /> <br />Prior to any site preparation, I Executive Director of the <br />grading or construction. PBA or hislher designee. <br /> <br />Page / I <br />
The URL can be used to link to this page
Your browser does not support the video tag.