Laserfiche WebLink
<br />One Broadway Plaza Project Mitigation Moni{Qring Program <br /> <br />TABLEt <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />Mitigation Measure <br /> <br />PS-I3 <br /> <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />U-I <br /> <br />Utilities and Service Systems <br />The project developer shall coordinate with SCE prior to construction to determine the exact location of <br />all underground and overhead electrical facilities or taking action which could damage such facilities or <br />interfere with their operations. The Contractor shall protect all electric facilities and associated structures <br />to be left on the Droiect site from damaQe. <br /> <br />U:\VFregoso\WP5J\REPORTSIOne Broadway MMP.doc <br />June /4, 2004 <br /> <br />Implementation <br />Schedule <br />During all site preparation, <br />grading or construction <br /> <br />Responsible <br />Department <br />Executive Director of the <br />PBA or his/her designee. <br /> <br />Prior to any site preparation, I Executive Director of the <br />grading or construction. PBA or his/her designee. <br /> <br />Page /2 <br />