My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75F - ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
75F - ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:54 PM
Creation date
7/15/2004 11:29:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75F
Date
7/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />One Broadway Plaza Project Mitigation Monitorh]gfro¡;ram <br /> <br />TABLEt <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />Mitigation Measure <br /> <br />U-2 <br /> <br />All new electrical lines shall be placed underground as required by the City of Santa Ana. <br /> <br />U-3 <br /> <br />The project developer shall coordinate with SCGC prior to construction to determine the exact location of <br />all underground natural gas facilities and take action to prevent damage to these facilities or interference <br />with their operations. The Contractor shall protect all natural gas pipelines and associated structures to be <br />left on the project site from damage. <br />The project developer shall coordinate with Adelphia (fonnerly Comcast) prior to construction to <br />detennine the exact location of all underground cable facilities or taking action which could damage such <br />facilities or interfere with their operations. The Contractor shall protect all existing cable lines and <br />associated structures to be left on the project site from damage. <br />The project developer shall coordinate with Pacific Bell prior to construction to determine the exact <br />location of all underground telephone facilities or taking action which could damage such facilities or <br />interfere with their operations. The Contractor shall protect all existing telephone lines and associated <br />structures to be left on the project site from damage. <br />Prior to issuance of grading pennits, the project developer shall demonstrate to the City of Santa Ana that <br />construction-related waste generated on site would be recycled wherever feasible as the first choice of <br />disposal method, leaving the option of landfill disposal as a last alternative. The proposed commercial <br />use shall incorporate facilities for collection and pick-up of recyclable materials into the design of the <br />project office building. The project developer shall coordinate with City staff to develop appropriate <br />recycling programs for this project. <br />The project developer shall coordinate with the Santa Ana Water Utility prior to construction to determine <br />the exact location of all existing underground water facilities and take action to prevent damage to these <br />facilities to be left on the project site or interference with their operations. The project developer shall <br />also pay their fair share amount for the necessary facilities to accommodate project-related water supplies. <br />The project developer shall coordinate with CSDOC and the City of Santa Ana Public Works Department <br />prior to construction to detennine the exact location of all underground sewer facilities and take action to <br />prevent damage to these facilities or interference with their operations. The Contractor shall protect all <br />sewer lines and associated structures that will be left on the project site from damage. <br /> <br />U-4 <br /> <br />U-5 <br /> <br />U-6 <br /> <br />U-7 <br /> <br />U-8 <br /> <br />U-9 <br /> <br />The project developer shall pay their fair share amount, as detennined by the City of Santa Ana, to <br />construct the proposed stonn drain system serving the project site to Broadway Street in accordance with <br />the City's Master Plan of Drainage. <br />The project developer shall pay all costs for the construction of a new 8-inch waterline and a 6-inch sewer <br />to be constructed within Washington A venue and 10th Street to replace these lines abandoned in a portion <br />of Sycamore Street. <br /> <br />U-IO <br /> <br />U: \VFregosol WP5 1 IREPORTS\One Broadway MMP.doc <br />June 14. 2004 <br /> <br />Implementation <br />Schedule <br />During construction. <br /> <br />Prior to any site preparation, <br />grading or construction. <br /> <br />Responsible <br />Department <br />Executive Director of the <br />PW A or histher designee. <br />Executive Director of the <br />PW A or histher designee. <br /> <br />Prior to any site preparation, I Executive Director of the <br />grading or construction. PW A or histher designee. <br /> <br />Prior to any site preparation, I Executive Director of the <br />grading or construction. PW A or histher designee. <br /> <br />Prior to issuance of the <br />grading penni t. <br /> <br />Executive Director of the <br />PBA or histher designee. <br /> <br />Prior to any site preparation, I Executive Director of the <br />grading or construction. PW A or histher designee. <br /> <br />Prior to any site preparation, I Executive Director of the <br />grading or construction. PW A or histher designee. <br /> <br />At issuance of first building I Executive Director of the <br />permit PW A or histher designee. <br /> <br />At issuance of first building I Executive Director of the <br />pennit PW A or histher designee. <br /> <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.