Laserfiche WebLink
<br /> <br />TABLEt <br />MITIGA TION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> <br />One Broadway Plaza Project Mitigation Monitoring Program <br /> <br />Mitigation Measure <br /> <br />Implementation <br />Schedule <br /> <br />During all site preparation, <br />grading and construction. <br /> <br />Responsible <br />Departmcnt <br />Executive Director of the <br />PBA or his/her designee <br />and the Orange County <br />Coroner. <br /> <br />CR-6 Human Remains. <br /> <br />If Human Remains arc found during the test excavation, the Native American Graves Protection Act <br />Guidelines and State law require that the crew halt the work in the immediate area; leave the remains in <br />place and contact the City of Santa Ana project personnel and the Orange County Coroner. Until a <br />representative of the Coroner's office reviews the remains in the field, they must not be removed. If the <br />Coroner detem1ines that the remains are prehistoric, the Coroner will contact the Native American <br />Heritage Commission and the most likely descendent from the Native American community will be <br />informed. The final deposition of remains will be coordinated by representatives of the property owner <br />and the most likely descendent. <br />Artifacts. <br /> <br />CR-7 <br /> <br />Any artifacts recovered shall be properly collected with photographs, field notes and locations plotted on <br />a USGS 7.5' topographic quadrangle and a project map. Artifacts will he identified, catalogued and <br />stabilized for cura1Ïon. Any recovered artifacts shall be offered, on a first right-of-refusal basis, to a <br />repository with a retrievahle collection system and an educational and research interest in the materials. <br />The Anthropology Museum at California State University, Fu]Jerton would be an appropriate repository to <br />receive any artifact~<:.oll<::c_~~~~J~-.r-.!:~ct site. - .-----.--- <br />Final Report. <br /> <br />During all site preparation, <br />grading and construction. <br /> <br />Executive Director of the <br />PßA or his/her designee <br /> <br />CR-8 <br /> <br />-----."-- <br /> <br />After the completion of all <br />site disturbance activities. <br /> <br />Executive Director of the <br />PBA or his/her designee. <br /> <br /> <br /> <br />-;. - ~ :4;~{~:.(-. <br /> <br />U.-IVFregoso \ WP5 1 \REPORTS\One Broadway MMP.doc <br />June 14. 2004 <br /> <br />Page 18 <br />