My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75F - ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
75F - ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:54 PM
Creation date
7/15/2004 11:29:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75F
Date
7/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />One Broadway Plaza <br />Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />may generate surface runoff with pollutants, and will reduce these potentially significant adverse <br />impacts to below a level of significance. <br /> <br />W -5 Prior to the issuance of grading pennits, the Project Developer shall submit a final drainage <br />plan for the proposed One Broadway Plaza project for review and approval by the City <br />Engineer. <br /> <br />W -6 Prior to the issuance of the first building pennit, the Project Developer shall pay the City's <br />drainage impact fee.. . <br /> <br />W-7 <br /> <br />During operation of the proposed project, the Project Owner/Operator shall ensure that all <br />pest control, herbicide, insecticide and other similar substances used as part of maintenance <br />of project features are handled, stored, applied and disposed consistent with all applicable <br />federal, state and local regulations. The City Engineer shall monitor and enforce this <br />prOVISIon. <br /> <br />W -8 Prior to the issuance of grading pennits, the City Engineer shall verify that structural BMPs <br />have been pennanently incorporated into project plans by the applicant. Such BMPs shall <br />ensure that pollutants from project-related stonn water are mitigated consistent with <br />applicable state and local standards. <br /> <br />4.2.3 IMPACTS RELATED TO AIR QUALITY <br /> <br />4.2.3.1 Potentially SÜmificant Adverse Impacts Related to Short Tenn Air Ouality <br /> <br />As described in detail in Section 3.3 (Air Quality) in the EIR, the project will result in short tenn <br />construction related air quality impacts. <br /> <br />4.2.3.2 Findings Related to Short Tenn Air Ouality Impacts <br /> <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />proj ect which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br /> <br />4.2.3.3 Facts in Support of the Finding Related to Short Tenn Air Oualitv Impacts <br /> <br />Implementation of ~itigation measures AQ-l to AQ-15, provided earlier, will substantially <br />lessen the adverse impacts of the One Broadway Plaza project related to short tenn ~r quality <br />and will reduce these potentially significant adverse impacts to below a level of significance, <br />except for short term to NOx and PMlO, as described earlier. <br /> <br />4.2.3.1 Potentiallv Significant Adverse Im?acts Related to Long Tenn Air Ouality Impacts <br /> <br />As described in detail in Section 3.4 (Air Quality) in the EIR, long tenn operation of the project <br />would generate air quality pollutants. <br /> <br />U/vfregoso/wp51/reports/One Broadway final findings <br />June 28,2004 <br /> <br />Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.