Laserfiche WebLink
<br />JUNE 28, 2004 <br />PAGE20F3 <br /> <br />5. <br /> <br />The permit applicant recognizes that the frequencies used by <br />the cellular facility located at 1710 East Seventeenth Street <br />are extremely close to the frequencies used by the City of <br />Santa Ana for Public Safety. This proximity will require <br />extraordinary "comprehensive advanced planning and frequency <br />coordination" engineering measures to prevent interference, <br />especially in the choice of frequencies and radio ancillary <br />hardware. This is encouraged in the "Best Practices Guide" <br />published by the Association of Public-Safety Communications <br />Officials-International, Incorporated (APCO), and as endorsed <br />by the Federal Communications Commission (FCC). Prior to the <br />issuance of any permits to install the facility, (Permit <br />Applicant) shall meet in good faith to coordinate the use of <br />frequencies and equipment with the Santa Ana Police Department <br />and the Communications Division of the Orange County Sheriff- <br />Coroner Department to minimize, to the greatest extent <br />possible, any interference with the Public Safety 800 MHz <br />Countywide Coordinated Communications System (CCCS). Similar <br />consideration shall be given to any other existing or proposed <br />wireless communications facility that may be located on the <br />subject property. <br /> <br />6. <br /> <br />At all times, the permit applicant shall not <br />of Santa Ana from having adequate spectrum <br />City's 800 MHz radio frequency. <br /> <br />prevent the City <br />capacity on the <br /> <br />7. <br /> <br />Before activating its facility, the permit applicant will <br />submit to a post-installation test to confirm that "advanced <br />planning and frequency coordination" of the facility was <br />successful in not interfering with the City of Santa Ana <br />Public Safety radio equipment. This test will be conducted by <br />the Santa Ana Police Department and the Communications <br />Division of the Orange County Sheriff-Coroner Department or a <br />Division-approved contractor at the expense of the Applicant. <br />This post-installation testing process shall be repeated for <br />every proposed frequency addition and/or change to confirm the <br />intent of the "frequency planning" process has been met. <br /> <br />8. <br /> <br />The permit applicant shall provide a 24-hour <br />which interference problems may be reported. <br />will also apply to all existing facilities <br />Santa Ana. <br /> <br />phone number to <br />This condition <br />in the City of <br /> <br />31A-14 <br />