Laserfiche WebLink
<br />to construct new fire protection facilities. Additionally, <br />through the City's development review process, the Santa Ana <br />Fire Department has determined that the proj ect has adequate <br />fire protection measures and facilities. <br /> <br />Police Department: <br /> <br />Potentially <br />Incorporated <br /> <br />Significant <br /> <br />Unless <br /> <br />Mitigation <br /> <br />The Santa Ana Police Department would provide police protection <br />services for the proposed proj ect . The City of Santa Ana is <br />subdivided into four policing districts, with each district <br />serving a section of the City. The proposed project is located <br />within the South Coast District. The average police response <br />time within the reporting district is 8.1 minutes. <br /> <br />Implementation of the proposed project would not significantly <br />increase the demand for police protection services over current <br />levels of demand within the project area. The Santa Ana Police <br />Department has indicated that under existing levels of manpower <br />and equipment, they would have the ability to provide adequate <br />police protection services. However, the radio frequencies that <br />would be used at the cellular facility would be close to the <br />frequencies used by the City of Santa Ana for Public Safety. <br />Without proper coordination, the proposed project could <br />interfere with the radio frequencies of the city. To prevent <br />radio frequency interference, the following mitigation measure <br />shall be implemented. <br /> <br />Mitigation Measure <br /> <br />. <br /> <br />Prior to the issuance of any permits to install the <br />facility, the project applicant shall meet in good faith to <br />coordinate the use of frequencies and equipment with the <br />Communications Division of the Orange County Sheriff Corner <br />Department to minimize, to the greatest extent possible, <br />any interference with the Public Safety 800 MHz Countywide <br />Coordinated Communications System. <br /> <br />. <br /> <br />At all times, the project applicant shall not prevent the <br />City of Santa Ana from having adequate spectrum capacity on <br />the City's 800 MHz radio frequency. <br /> <br />. <br /> <br />Before activating its facility, the project applicant shall <br />submit to a post-installation test to confirm that advanced <br />planning and frequency coordination of the facility was <br />successful in not interfering with the City of Santa Ana <br />Public Safety radio equipment. The Communications Division <br /> <br />10 <br /> <br />3'1g~~2ä <br />