My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2004
>
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:44 PM
Creation date
7/29/2004 5:12:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2004-020
Date
7/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />"U:;u <br />[\) CD <br />(Coo <br />CD 0 <br />~E <br />00: <br />0 0 <br />_:J <br />-....Z <br />w~ <br />N <br />0 <br />0 <br />.þ. <br />I <br />0 <br />N <br />0 <br /> <br />TABLE 1 <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br />AQ-lO Where feasible utilize existing power sources (e.g., power poles) or clean fuel generators rather than temporary During all site preparation, Executive Director of the <br /> power generators. grading and construction. PW AIPBA or his/her <br /> designee. <br />AQ-II Provide on-site power sources during the early stages of the project. During all site preparation, Executive Director of the <br /> grading and construction. PW AIPBA or his/her <br /> designee. <br />AQ-12 Where feasible use low emission on-site stationary equipment (e.g. clean fuels). During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-I3 Spread soil binders on site, unpaved roads and parking areas. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-14 Apply chemical soil stabilizers according to manufacturer's specifications to all inactive construction areas During all site preparation, Executive Director of the <br /> (previously graded areas which remain inactive for 96 hours). grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-15 Reestablish groundcovers on construction site through seeding and watering of the site that will not be disturbed During all site preparation, Executive Director of the <br /> for lengthy periods (such as two months or more). grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-16 Schedule truck deliveries and pickups during off-peak hour. During operations. Executive Director of the <br /> PW AIPBA or his/her <br /> designee. <br />AQ-17 Provide adequate ingress and egress at all entrances to public facilities to minimize vehicle idling at curbsides. During operations. Executive Director of the <br /> PW AlPBA or his/her <br /> designee. <br />AQ-18 Provide dedicated turn lanes as appropriate and provide roadway improvements at heavily congested roadways. During operations. Executive Director of the <br /> PW AIPBA or his/her <br /> designee. <br />AQ-19 Provide on-site services. During operations. Executive Director of the <br /> PW AIPBA or his/her <br /> designee. <br />AQ-20 Improve thermal integrity of the buildings and reduce thermal load with automated time clocks or occupant During operations. Executive Director of the <br /> sensors. PW AlPBA or his/her <br /> designee. <br />AQ-21 Install energy efficient street and parking lot lighting. During operations. Executive Director of the <br /> PW AIPBA or his/her <br /> designee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.