Laserfiche WebLink
<br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />"U:;u <br />[\) CD <br />(Coo <br />CD 0 <br />~E <br />00: <br />0 0 <br />_:J <br />-.... Z <br />w~ <br />N <br />0 <br />0 <br />.þ. <br />I <br />0 <br />N <br />0 <br /> <br />TABLE 1 <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br />AQ-lO Where feasible utilize existing power sources (e.g., power poles) or clean fuel generators rather than temporary During all site preparation, Executive Director of the <br /> power generators. grading and construction. PW AIPBA or his/her <br /> designee. <br />AQ-II Provide on-site power sources during the early stages of the project. During all site preparation, Executive Director of the <br /> grading and construction. PW AIPBA or his/her <br /> designee. <br />AQ-12 Where feasible use low emission on-site stationary equipment (e.g. clean fuels). During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-I3 Spread soil binders on site, unpaved roads and parking areas. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-14 Apply chemical soil stabilizers according to manufacturer's specifications to all inactive construction areas During all site preparation, Executive Director of the <br /> (previously graded areas which remain inactive for 96 hours). grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-15 Reestablish groundcovers on construction site through seeding and watering of the site that will not be disturbed During all site preparation, Executive Director of the <br /> for lengthy periods (such as two months or more). grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-16 Schedule truck deliveries and pickups during off-peak hour. During operations. Executive Director of the <br /> PW AIPBA or his/her <br /> designee. <br />AQ-17 Provide adequate ingress and egress at all entrances to public facilities to minimize vehicle idling at curbsides. During operations. Executive Director of the <br /> PW AlPBA or his/her <br /> designee. <br />AQ-18 Provide dedicated turn lanes as appropriate and provide roadway improvements at heavily congested roadways. During operations. Executive Director of the <br /> PW AIPBA or his/her <br /> designee. <br />AQ-19 Provide on-site services. During operations. Executive Director of the <br /> PW AIPBA or his/her <br /> designee. <br />AQ-20 Improve thermal integrity of the buildings and reduce thermal load with automated time clocks or occupant During operations. Executive Director of the <br /> sensors. PW AlPBA or his/her <br /> designee. <br />AQ-21 Install energy efficient street and parking lot lighting. During operations. Executive Director of the <br /> PW AIPBA or his/her <br /> designee. <br />