My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2004
>
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:44 PM
Creation date
7/29/2004 5:12:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2004-020
Date
7/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />TABLE 1 <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />::u <br />CD <br />00 <br />Q. <br />c:: <br />...... <br />õ' <br />:J <br />-,:¡Z <br />[\) ~ <br />(CN <br />CD 0 <br />(DO <br />o~ <br />-0 <br />-""N <br />WO <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br />W-8 Prior to the issuance of grading permits, the City Engineer shall verifY that structural BMPs have been permanently Prior to the issuance ofthe Executive Director of the <br /> incorporated into project plans by the applicant. Such BMPs shall ensure that pollutants from project-related storm grading permit. PW A or his/her designee. <br /> water are mitigated consistent with applicable state and local standards. <br /> Air Qualitv <br />AQ-I Use low-emission mobile construction equipment where feasible. During all site preparation, Executive Director of the <br /> grading and construction. PW AIPBA or his/her <br /> designee. <br />AQ-2 Water site and clean equipment morning and evening to comply with AQMD Fugitive Dust Measures BCM-03 During all site preparation, Executive Director of the <br /> and BCM-06. As part of the conditions of grading permit approval, the project shall water the construction site grading and construction. PW AIPBA or his/her <br /> and unpaved haul roads (with use of reclaimed water or chemical soil binder, where feasible) twice daily. designee. <br />AQ-3 Wash off trucks leaving the site to comply with AQMD Fugitive Dust Measure BCM-Ol. As part of the During all site preparation, Executive Director of the <br /> conditions of grading permit approval, project construction contractors shall wheel wash construction equipment grading and construction. PW AIPBA or his/her <br /> and cover dirt in trucks during on-road hauling. This measure is already included in the particulate emission designee. <br /> projections in the report. Haul trucks leaving the site shall also have a minimum freeboard distance of 12", or <br /> cover payloads. <br />AQ-4 Sweep streets if silt is carried over to adjacent public thoroughfares. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> desi~nee. <br />AQ-5 Reduce traffic speeds on all unpaved road surfaces to 15 miles per hour or less. During all site preparation, Executive Director of the <br /> grading and construction. PW A IPBA or his/her <br /> designee. <br />AQ-6 Suspend grading operations during first and second stage smog alerts. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-7 Suspend all grading operations when wind speeds (as instantaneous gusts) exceed 25 miles per hour. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> designee. <br />AQ-8 Maintain construction equipment engines by keeping them tuned. During all site preparation, Executive Director of the <br /> grading and construction. PW AlPBA or his/her <br /> desi~nee. <br />AQ-9 Where feasible use low sulfur fuel for stationary construction equipment. During all site preparation, Executive Director of the <br /> grading and construction. PW AIPBA or his/her <br /> designee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.