My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2004
>
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:44 PM
Creation date
7/29/2004 5:12:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2004-020
Date
7/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />"1J:;tJ <br />[\) CD <br />:c 00 <br />CD 0 <br />~E <br />N!:!: <br />0 0 <br />_:J <br />-....Z <br />(,,)!=> <br />N <br />0 <br />0 <br />.þ.. <br />I <br />0 <br />N <br />0 <br /> <br />TABLE 1 <br />MITIGATION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> Mitigation Measure Implementation <br /> Schedule <br /> Trans ortation <br />T-l The developer shall pay all costs (design, construction, administration and inspection) for Washington Avenue At issuance of certificate of Executive Director ofthe <br /> and 10th Street to operate as one-way streets which include signal modifications and appropriate protected left- occupancy permit. PW A or his/her designee. <br /> turn signal at Main Street/Washington Avenue, Main Street/10th Street, Washington Avenue/Sycamore Street, <br /> Broadwa Street/Washin on Avenue and Broadwa Street/lOth Street. <br />T-2 The project proponent shall pay for all costs for the installation of a roundabout at the intersection of Sycamore Street At issuance of the certificate Executive Director of the <br /> and 10th Street. of occu anc ermit. PW A or his/her desi nee. <br />T-3 The project proponent shall pay all costs to install pedestrian crosswalks and a refuge area at the intersection of At issuance of the certificate Executive Director of the <br /> Sycamore Street and 10th Street where a roundabout is to be constructed. The project developer shall be required to of occupancy permit. PW A or his/her designee. <br /> pay all costs (design, construction, administration and inspection) for these mitigation measures, as they are part ofthe <br /> roundabout as stated in T-2. <br />T-4 Main Street, between 17' Street and the 1-5 ramps, shall have all on-street parking stalls and parking meters At issuance ofthe certificate Executive Director of the <br /> removed, and Main Street shall be restriped to provide three northbound and two southbound travel lanes. The of occupancy permit. PW A or his/her designee. <br /> project proponent shall pay all costs (design, construction, administration and inspection) associated with these <br /> removals and re-stri in when buildin ermits are issued. <br />T-5 Main Street, between 17 Street and Civic Center Drive, shall have all on-street parking stalls and parking meters At issuance of the certificate Executive Director ofthe <br /> removed and Main Street shall be re-striped to provide a third northbound through lane within the existing right-of- of occupancy permit. PW A or his/her designee. <br /> wa . The develo r shall a all costs associated with re-stri in and removin existin arkin meters. <br />T-6 The developer shall pay all costs (acquisition, design, construction, administration and inspection) for providing At issuance of the certificate Executive Director ofthe <br /> southbound ri ht-turn lane at the intersection of Main Street and 17th Street. of occu anc ermit. PW A or his/her desi nee. <br />T-7 The developer shall pay all costs (acquisition, design, construction, administration and inspection) for providing At issuance of the certificate Executive Director ofthe <br /> southbound ri ht-turn lane at the intersection of Broadwa Street and l7'h Street. of occu anc ermit. PW A or his/her desi ee. <br />T-8 Westbound Santa Clara Avenue shall be re-striped at Broadway Street to provide one left turn lane and one shared left At issuance of the certificate Executive Director of the <br /> tum/right turn lane. The project proponent shall pay all costs (design, construction, administration and inspection) of occupancy permit. PW A or his/her designee. <br /> associated with this re-stri in when ro'ect buildin rmits are issued. <br />T-9 Northbound Grand Avenue from Fruit Street to 14 Street shall be re-striped at Santa Ana Boulevard/I-5 HOY ramps At issuance of the certificate Executive Director of the <br /> to provide three northbound travel lanes. The project proponent shall pay all costs (design, construction, of occupancy permit. PW A or his/her designee. <br /> administration and ins ction) associated with this re-stri in when ro'ect buildin ermits are issued. <br />T-IO 1-5 northbound off-ramp shall be re-striped to provide a westbound left turn lane, a shared left turn/right turn lane At issuance of the certificate Executive Director of the <br /> and a right turn lane at Grand Avenue. The project developer shall pay all costs (design, permitting, construction, of occupancy permit. PW A or his/her designee. <br /> administration and inspection) when building permits are issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.