My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2004
>
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:44 PM
Creation date
7/29/2004 5:12:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2004-020
Date
7/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />TABLE 1 <br />MITIGA TION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />:;tJ <br />CD <br />00 <br />Q. <br />c:: <br />...... <br />õ' <br />:J <br />ìJz <br />[\) 0 <br />(C . <br />CDN <br />->. 0 <br />(,.)0 <br />0 ~ <br />-0 <br />-""N <br />(,,)0 <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule De artment <br />T-II A new traffic signal shall be installed at the intersection of Main Street and 15 Street. Communications cable and At issuance of the certificate Executive Director of the <br /> conduit required to connect the traffic signal to the City of Santa Ana's Traffic Signal Master System shall be a part of of occupancy permit. PW A or his/her designee. <br /> traffic signal installation. The project proponent shall pay all costs (design, construction, administration and <br /> ins ection associated with this si alization when ro'ect buildin ermits are issued. <br />T-12 A new traffic signal shall be installed at the intersection of Santa Ana Boulevard and French Street. Communications At issuance of the certificate Executive Director ofthe <br /> cable and conduit required to connect the traffic signal to the City of Santa Ana's Traffic Signal Master System shall of occupancy permit. PW A or his/her designee. <br /> be a part of traffic signal installation. The project proponent shall pay all costs (design, construction, administration <br /> and ins ection) associated with this si alization when buildin ermits are issued. <br />T-13 A new traffic signal shall be installed at the intersection of Sycamore Street and 15' Street. Communications cable At issuance of the certificate Executive Director ofthe <br /> and conduit required to connect the traffic signal to the City of Santa Ana's Traffic Signal Master System shall be a of occupancy permit. PW A or his/her designee. <br /> part of traffic signal installation. The project proponent shall pay all costs (design, construction, administration and <br /> ins ection associated with this si alization when buildin ermits are issued. <br />T-14 The project proponent shall pay the appropriate City Transportation System Improvement Fee to help offset the At issuance of the certificate Executive Director of the <br /> One Broadwa Plaza Pro' ects' im act on the Ci of Santa Ana street s stem. of occu anc ermit. PW A or his/her desi nee. <br />T-15 The developer should coordinate with the Orange County Transportation Authority (OCTA) to identifY ways to During construction and prior Executive Director of the <br /> enhance transit use by tenants of One Broadway Plaza. The project developer shall install a bus stop, bus transit or to Certificate of Occupancy. PW A or his/her designee. <br /> an other transit related im rovements if re uested b the OCT A. <br />T-16 The project proponent shall satisfY the relevant requirements of the City's TDM Ordinance, including conformity of At issuance of certificate of Executive Director ofthe <br /> site plans with facility standards specified in the TDM Ordinance, and submission and implementation of a TDM occupancy and during PW A or his/her designee. <br /> strate Ian and ro am. 0 eration <br />T-17 The project developer shall contribute to neighborhood traffic studies for the six neighborhoods evaluated in At issuance of the certificate Executive Director of the <br /> Section 3.5.8 (including before and after traffic counts) in order to assess any intrusion of project traffic into these of occupancy permit. PW A or his/her designee. <br /> neighborhoods. If traffic intrusion attributable to the project is identified, corrective measures will be identified. <br /> Depending of the potential impacts, examples of corrective measures could include; forced-turn channelization, <br /> semi-diverters, diagonal diverters and cul-de-sacs. If approved by the neighborhoods per the City's Procedures <br /> for Neighborhood Traffic Plans, corrective measures will be implemented at a maximum cost to the developer of <br /> $200,000 per neighborhood. The funds to implement the improvements are directly payable to the City of Santa <br /> Ana rior to issuance of build in ermits. <br />T-18 The project parking garage entrances/exits shall be designed to meet City sight distance standards. A new landscaped At issuance of the certificate Executive Director of the <br /> median shall be constructed at the intersection of Broadway and the parking structure egress to restrict left turn of occupancy permit. PW A or his/her designee. <br /> movements of vehicles exiting on Broadway subject to the review and approval of the City Engineer. The project <br /> ro onent shall pay all costs associated with this median prior to buildin ermits being issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.