Laserfiche WebLink
<br />"1J:::C <br />[\) CD <br />:c 00 <br />CD 0 <br />.....2" <br />CX>~ <br />0 0 <br />_:J <br />-.... Z <br />(,.)0 <br /> <br />N <br />0 <br />0 <br />.þ.. <br />I <br />0 <br />N <br />0 <br /> <br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />TABLE 1 <br />MITIGA TION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br />U-4 The project developer shall coordinate with Adelphia (formerly Comcast) prior to construction to determine the Prior to any site preparation, Executive Director of the <br /> exact location of all underground cable facilities or taking action which could damage such facilities or interfere grading or construction. PW A or his/her designee. <br /> with their operations. The Contractor shall protect all existing cable lines and associated structures to be left on <br /> the project site from damage. <br />U-5 The project developer shall coordinate with Pacific Bell prior to construction to determine the exact location of all Prior to any site preparation, Executive Director of the <br /> underground telephone facilities or taking action which could damage such facilities or interfere with their grading or construction. PW A or his/her designee. <br /> operations. The Contractor shall protect all existing telephone lines and associated structures to be left on the <br /> project site from damage. <br />U-6 Prior to issuance of grading permits, the project developer shall demonstrate to the City of Santa Ana that Prior to issuance of the Executive Director of the <br /> construction-related waste generated on site would be recycled wherever feasible as the first choice of disposal grading permit. PBA or his/her designee. <br /> method, leaving the option of landfill disposal as a last alternative. The proposed commercial use shall <br /> incorporate facilities for collection and pick-up of recyclable materials into the design of the project office <br /> building. The project developer shall coordinate with City staff to develop appropriate recycling programs for <br /> this proi ect. <br />U-7 The project developer shall coordinate with the Santa Ana Water Utility prior to construction to determine the Prior to any site preparation, Executive Director ofthe <br /> exact location of all existing underground water facilities and take action to prevent damage to these facilities to grading or construction. PW A or his/her designee. <br /> be left on the project site or interference with their operations. The project developer shall also pay their fair <br /> share amount for the necessary facilities to accommodate project-related water sUDDlies. <br />U-8 The project developer shall coordinate with CSDOC and the City of Santa Ana Public Works Department prior to Prior to any site preparation, Executive Director of the <br /> construction to determine the exact location of all underground sewer facilities and take action to prevent damage grading or construction. PW A or his/her designee. <br /> to these facilities or interference with their operations. The Contractor shall protect all sewer lines and associated <br /> structures that will be left on the project site from damage. <br />U-9 The project developer shall pay their fair share amount, as determined by the City of Santa Ana, to construct the At issuance of first building Executive Director of the <br /> proposed storm drain system serving the project site to Broadway Street in accordance with the City's Master Plan permit PW A or his/her designee. <br /> of Drainage. <br />U-lO The project developer shall pay all costs for the construction of a new 8-inch waterline and a 6-inch sewer to be At issuance of first building Executive Director of the <br /> constructed within Washington Avenue and 10th Street to replace these lines abandoned in a portion of Sycamore permit PW A or his/her designee. <br /> Street. <br /> Aesthetics <br />AS-l The project proponent will ensure that all outdoor lighting and fixtures, including lighting for construction, are During final design, Executive Director of the <br /> shielded or designed and located to minimize nighttime light spillage onto adjacent uses. Outdoor fixtures will be construction and operations. PW AIPBA or his/her <br /> designed to generate less than O.25-foot candle power of light where possible, designee. <br />