My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2004
>
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:44 PM
Creation date
7/29/2004 5:12:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2004-020
Date
7/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />TABLE 1 <br />MITIGA TION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />:;tJ <br />CD <br />00 <br />Q. <br />c:: <br />...... <br />õ. <br />:J <br />"'Cz <br />~ ~ <br />CDN <br />--"0 <br />-....O <br />0 ~ <br />-0 <br />-""N <br />(,,)0 <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br /> . The closure of the sidewalks on Washington Avenue, Tenth Street, Sycamore Street and Broadway adjacent to <br /> the project site. Appropriate signs shall be posted that the sidewalks are closed and pedestrians are directed to use <br /> sidewalks on the opposite sides of the streets. <br /> . Barricading the perimeter of the project site with temporary fencing to secure construction equipment, <br /> minimizing trespassing, vandalism and short-cut attractions, and to reduce hazards to students during project <br /> demolition activities. <br /> . The posting of a flag person at the entrance(s) to the project site to protect pedestrians from conflicts with heavy <br /> equipment and haul trucks entering or leaving the project site during the times of school arrivals and departures. <br /> . The funding of crossing guards at the intersection of Washington Avenue and Broadway, Washington Avenue <br /> and Sycamore Street, Tenth and Sycamore Streets and Tenth Street and Broadway. Crossing guards shall be <br /> provided during the times of school arrivals and departures when the schools are in session Monday through <br /> Friday. If determined to be necessary by the principal of the Orange County High School of the Arts (OCHSA), <br /> provide crossing guards at the intersection of Sycamore and Tenth Streets when special daytime performances are <br /> held at the OCHSA auditorium. <br /> . Provide sufficient written notice of commencement and completion of project construction activities to the <br /> principals of Willard Intermediate School and the Orange County High School of the Arts. <br /> . Provide the name and telephone number of a contact person who is knowledgeable about the project for the <br /> developer and construction contractor for use by the principals of Willard Intermediate School and the Orange <br /> County High School of the Arts. <br /> Utilities and Service Systems <br />U-l The project developer shall coordinate with SCE prior to construction to determine the exact location of all Prior to any site preparation, Executive Director ofthe <br /> underground and overhead electrical facilities or taking action which could damage such facilities or interfere grading or construction. PBA or his/her designee. <br /> with their operations. The Contractor shall protect all electric facilities and associated structures to be left on the <br /> project site from damage. <br />U-2 All new electrical lines shall be placed underground as required by the City of Santa Ana. During construction. Executive Director of the <br /> PW A or his/her designee. <br />U-3 The project developer shall coordinate with SCGC prior to construction to determine the exact location of all Prior to any site preparation, Executive Director of the <br /> underground natural gas facilities and take action to prevent damage to these facilities or interference with their grading or construction. PW A or his/her designee. <br /> operations. The Contractor shall protect all natural gas pipelines and associated structures to be left on the project <br /> site from damage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.