My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - TENTATIVE TRACT MAP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
08/02/2004
>
31A - TENTATIVE TRACT MAP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:34 PM
Creation date
8/6/2004 11:16:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
8/2/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JULY 12, 2004 <br />PAGE20F5 <br /> <br />6. <br /> <br />7. <br /> <br />8. <br /> <br />9. <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />All clearing and earthwork activities shall cease during period <br />of high winds (winds greater than 25 mph averaged over one hour) <br />or during Stage 1 or Stage 2 smog episodes. <br /> <br />Streets surrounding the project site should be cleaned at the <br />end of each day of construction. <br /> <br />All materials transported off-site shall either be sufficiently <br />watered or securely covered to prevent excessive amounts of <br />dust. <br /> <br />The amount of area disturbed by clearing <br />activities shall be minimized at all times. <br /> <br />and <br /> <br />earthwork <br /> <br />To the extent feasible, equipment engines shall be maintained in <br />good condition and in proper tune according to manufacturer's <br />specifications. <br /> <br />To the extent feasible, gasoline powered equipment shall be used <br />for on-site and off-site construction activities. <br /> <br />Prior to issuance of a grading permit, the project applicant <br />shall provide proof of coverage under an NPDES General <br />Construction Activity Storm Water Permit, which includes a copy <br />of the project number and two copies of the Storm Water <br />Pollution Prevention Plan. <br /> <br />Foundations for two-story dwellings shall be <br />by a homogenous layer of certified compacted <br />five feet beyond the perimeter of the <br />footprint. <br /> <br />supported entirely <br />fill not less than <br />proposed building <br /> <br />The proj ect shall comply with the bearing capacity, lateral <br />design, concrete slab on-grade, asphalt concrete and seismic <br />coefficient design recommendations provided in the geotechnical <br />report prepared for the proj ect by Nunez Engineering, in May <br />2002. <br /> <br />Prior to grading, existing vegetation, trash, surface structures <br />and debris shall be removed and disposed off-site as a legal <br />dumpsite. Any existing utility lines or other subsurface <br />structures, which are not to be utilized, should be removed, <br />destroyed or abandoned in compliance with current governmental <br />regulations. <br /> <br />31A-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.