Laserfiche WebLink
<br />AJULY 12, 2004 <br />"PAGE50F5 <br /> <br />. <br /> <br />. <br /> <br />33. <br /> <br />34. <br /> <br />35. <br /> <br />36. <br /> <br />37. <br /> <br />38. <br /> <br />39. <br /> <br />Prior to the issuance of building permits, the project developer <br />shall submit evidence to the City of Santa Ana of a fee payment <br />between the developer and the Garden Grove School District to <br />offset school facility impacts. <br /> <br />Prior to issuance of building permits, the project shall pay <br />Area F Transportation System Improvement fee. <br /> <br />The site plan for the proposed project shall reflect the <br />construction of a six-inch public water main and appurtenances <br />at 10-feet north of the centerline of Lincoln Way. The project <br />applicant shall coordinate with the City of Santa Ana Water <br />Department regarding the final depths, and locations and of the <br />proposed water distribution facility. <br /> <br />The site plan for the proposed project shall reflect the <br />construction of a six-inch public water main and appurtenances <br />at 10-feet north of the centerline of Eleventh Street and to <br />extend approximately 200-feet to the east of the centerline on <br />Jackson Street. The project applicant shall coordinate with the <br />City of Santa Ana Water Department regarding the final depth, <br />and locations and of the proposed water distribution facility. <br /> <br />Water conservation measures recommended by the State Department <br />of Water Resources and applicable state laws requiring the use <br />of water-efficient plumbing fixtures and recommendations for <br />low-water using landscape shall be incorporated into the project <br />design as appropriate. <br /> <br />The site plan for the proposed project shall reflect the <br />construction of an eight-inch private sewer main and manhole at <br />five feet to the south of the centerline on Eleventh Street and <br />to extend approximately 200 feet to the east of centerline on <br />Jackson Street. The project applicant shall coordinate with the <br />City of Santa Ana Water Department regarding the final depth, <br />and locations of the proposed sewer distribution facility. <br /> <br />The proposed proj ect shall verify if the existing sewer line <br />along the length of the project site is active or abandoned. <br /> <br />31A-21 <br />