Laserfiche WebLink
<br />JULY 12,2004 <br />PAGE40F5 <br /> <br />21. <br /> <br />22. <br /> <br />23. <br /> <br />24. <br /> <br />25. <br /> <br />26. <br /> <br />27. <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />31. <br /> <br />32. <br /> <br />The proposed proj ect would be subj ect to City of <br />Federal Clean Water Protection Enterprise Fees. <br /> <br />Santa Ana <br /> <br />Prior to issuance of a grading permit, the project applicant <br />shall submit a final surface water runoff evaluation for review <br />and methods of draining the site without exceeding the capacity <br />of any street or adjacent storm drain facility. <br /> <br />Prior to <br />shall be <br />systems. <br /> <br />the issuance of building permits, the project applicant <br />responsible for the construction of on-site storm drain <br /> <br />The proposed proj ect <br />Fee. <br /> <br />is <br /> <br />subj ect to Drainage Area I Assessment <br /> <br />Prior to issuance of certificate of occupancy permits, the <br />project shall coordinate with Willowick Golf Course on the <br />construction of a 50-foot high safety net along the frontage of <br />the project along the fairway to deflect errant golf balls from <br />causing property damage. <br /> <br />Grading plans and building plans for the proposed project shall <br />note that construction activities on the project site shall not <br />take place between the hours of 8:00 p.m. and 7:00 a.m. on <br />weekdays, including Saturday, or any time on Sunday or a federal <br />holiday. <br /> <br />No construction equipment on the project <br />including warming up until after 7:00 a.m. <br /> <br />shall <br /> <br />operate <br /> <br />site <br /> <br />All construction equipment shall <br />tuned to minimize noise emissions. <br /> <br />be <br /> <br />maintained <br /> <br />and <br /> <br />properly <br /> <br />All equipment shall be fitted with properly operating mufflers <br />and air intake silencers no less efficient than those originally <br />installed. <br /> <br />Stockpiling and vehicle staging areas shall be located away from <br />existing residential uses. <br /> <br />The name and telephone <br />posted on-site. <br /> <br />number of <br /> <br />person shall <br /> <br />be <br /> <br />a <br /> <br />contact <br /> <br />Construction shall be subject to any and all provisions <br />forth by the City of Santa Ana Planning Department. <br /> <br />set <br /> <br />31A-20 <br />