Laserfiche WebLink
<br />The project area is improved with exiting wastewater <br />distribution facilities. However, it is unknown if the existing <br />sewer line located project site is active or abandoned. <br />Wastewater service for the proposed proj ect would be provided <br />by, the City of Santa Ana and the Orange County Sanitation <br />District (OCSD). Wastewater from the project would be treated at <br />the OCSD treatment plant No.1 in the City of Fountain Valley. <br /> <br />As mentioned previously, the City of Santa Ana utilizes a water <br />demand rate of 110 gallons per day per person to calculate both <br />domestic water demand and wastewater demand. The proposed <br />proj ect would have a wastewater demand of approximately 8,695 <br />gallons per day. The wastewater demands for the proj ect are <br />accounted for in the City's Urban Water Management Plan. The <br />wastewater flows generated from the proposed project would <br />provide an incidental increase in the amount of wastewater flows <br />to the Fountain Valley treatment plant and would not have a <br />significant impact on wastewater treatment facilities. However, <br />to adequately service the proposed project new wastewater <br />distribution facilities would be needed. With the construction <br />of new wastewater distribution facilities, impacts on wastewater <br />service would be less than significant. <br /> <br />Mitigation Measure <br /> <br />c. <br /> <br />. <br /> <br />The site plan for the proposed proj ect shall reflect the <br />construction of an 8-inch private sewer main and manhole at <br />5' to the south of the centerline on Eleventh Street and to <br />extend approximately 200' to the east of centerline on <br />Jackson Street. The project applicant shall coordinate with <br />the City of Santa Ana Water Department regarding the final <br />depths, and locations and of the proposed sewer <br />distribution facility. <br /> <br />. <br /> <br />The proposed proj ect shall verify if <br />line along the length of the proj ect <br />abandoned. <br /> <br />the existing sewer <br />site is active or <br /> <br />Require or result in the construction of new <br />drainage facilities or expansion of existing <br />the construction of which could cause <br />environmental effects? <br /> <br />storm water <br />facilities, <br />significant <br /> <br />Less Than Significant Impact <br /> <br />29 <br /> <br />31~!.52 <br />