Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />the City's Urban Water Management Plan. However, to adequately <br />service the proposed project new water distribution facilities <br />would be needed. With the construction of new water distribution <br />facilities, impacts on water service would be less than <br />significant. <br /> <br />Mitigation Measure <br /> <br />. <br /> <br />The site plan for the proposed project shall reflect the <br />construction of a 6-inch public water main and <br />appurtenances at 10-feet north of the centerline of Lincoln <br />Way. The project applicant shall coordinate with the City <br />of Santa Ana Water Department regarding the final depths, <br />and locations and of the proposed water distribution <br />facility. <br /> <br />. <br /> <br />The site plan for the proposed proj ect shall reflect the <br />construction of a 6-inch public water main and <br />appurtenances at 10-feet north of the centerline of <br />Eleventh Street and to extend approximately 200-feet to the <br />east of he centerline on Jackson Street. The project <br />applicant shall coordinate with the City of Santa Ana Water <br />Department regarding the final depths, and locations and of <br />the proposed water distribution facility. <br /> <br />. <br /> <br />Water conservation <br />Department of Water <br />requiring the use of <br />recommendations for <br />incorporated into the <br /> <br />measures recommended by the State <br />Resources and applicable state laws <br />water-efficient plumbing fixtures and <br />low-water-using . landscape shall be <br />project design as appropriate. <br /> <br />A. <br /> <br />Exceed wastewater treatment requirements <br />applicable Regional Water Quality Control Board? <br /> <br />the <br /> <br />of <br /> <br />B. <br /> <br />Require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br /> <br />E. <br /> <br />Result in the determination by the wastewater treatment <br />provider, which serves or may serve the project that it <br />has adequate capacity to sei-ve the project's projected <br />demand in addition to the providers existing commitments. <br /> <br />Less Than Significant Impact <br /> <br />28 <br /> <br />31~~5' <br />