My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 09 - Bristol-Tolliver Street Urban Green Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/18/2025
>
Item 09 - Bristol-Tolliver Street Urban Green Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 5:39:07 PM
Creation date
3/13/2025 8:05:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
9
Date
3/18/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol -Tolliver Street Urban Greening Project <br />March 18, 2025 <br />Page 4 <br />Contractor's work to ensure contract compliance, workmanship and quality, materials <br />testing, and implementation of the labor requirements. <br />Any of the allocated construction administration funds not spent are considered project <br />savings and are returned to the respective fund balance upon close out of the project. <br />As indicated in the Cost Analysis and as summarized in the table below, the estimated <br />total construction delivery cost of the project is $4,581,808. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$3,808,800 <br />Construction Administration <br />230,000 <br />Inspection <br />75,000 <br />Testing <br />87,128 <br />Project Contingencies 10% <br />380,880 <br />TOTAL CONSTRUCTION DELIVERY COST <br />$4,581,808 <br />Project Schedule and Contract Time <br />The completion date is January 2026, barring unforeseeable conditions such as rain, <br />natural disasters, or other delays beyond the control of the City and of the Contractor. <br />The contract time for this project is 160 working days, as specified in the bid documents. <br />Working days are counted in accordance with the City's Standard Specifications, which <br />exclude weekends, City -observed holidays, and inclement weather days that prevent <br />work. The projected project schedule is provided below. <br />Project Milestones <br />Milestone <br />Estimated Completion <br />Notes <br />Date <br />Administrative Startup <br />April 2025 <br />Contract execution, bonds, <br />insurance <br />Material Procurement <br />April -May 2025 <br />Lead times may affect <br />schedule <br />Contractor Mobilization <br />May 2025 <br />Start of construction <br />activities <br />Project Completion <br />January 2026 <br />Based on 160 working <br />days <br />Project Phasing <br />The contractor will be constructing this project in a singular phase, fulfilling the scope of <br />work as outlined in the contract documents. The contractor is responsible for <br />determining the scheduling and sequencing of activities based on their proposed means <br />and methods. Project features not included in this contract, such as the Skatepark and <br />
The URL can be used to link to this page
Your browser does not support the video tag.