Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Bristol -Tolliver Street Urban Greening Project <br />March 18, 2025 <br />Page 3 <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Legion Contractors, Inc. <br />Los Angeles, CA <br />$3,808,800 <br />2 <br />Los Angeles Engineering Inc. <br />Covina, CA <br />$3,952,000 <br />3 <br />Environmental Construction, Inc. <br />Woodland Hills, CA <br />$4,193,762 <br />4 <br />Vido Samarzich, Inc. <br />Rancho Cucamonga, CA <br />$4,278,980 <br />5 <br />KYA Services, LLC <br />Santa Ana, CA <br />$4,335,630 <br />6 <br />Urban Habitat <br />La Quinta, CA <br />$4,408,919 <br />7 <br />C.S. Legacy Construction, Inc. <br />Walnut, CA <br />$4,426,892 <br />8 <br />PCN3, Inc. <br />Los Alamitos, CA <br />$4,481,156 <br />9 <br />Bedrock Group, Inc. <br />La Canada, CA <br />$4,610,020 <br />10 <br />CEM Construction Corp <br />Montebello, CA <br />$4,883,195 <br />11 <br />GMZ Engineering, Inc. <br />Westlake Village, CA <br />$5,052,140 <br />12 <br />Pub Construction Inc. <br />Diamond Bar, CA <br />$5,590,108 <br />13 <br />Lonerock, Inc. <br />Irvine, CA <br />$5,994,110 <br />A total of 13 bids were received. Legion Contractors, Inc. submitted the lowest <br />responsive base bid in the amount of $3,808,800 (Exhibit 3). As specified in the bid <br />documents, the lowest bid shall be determined by the Base Bid. Bid Alternative items <br />were also included in the project specifications for a basketball court and skate park, <br />however budget has not been identified for these items so they are not included in the <br />contract award. <br />Legion Contractors, Inc. has previously performed work as a prime contractor in the City <br />of Santa Ana within the last five years, including the completed construction of Gerardo <br />Mouet Park and the current construction on the New Outdoor Library at Jerome Park <br />project. The contractor satisfactorily completed these projects and staff recommends <br />awarding the construction contract to Legion Contractors, Inc. for construction of the <br />Project (Exhibit 4). <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes a budget allocation construction administration, inspection, <br />and testing. Construction administration and inspection may be performed by either <br />Staff or consultants and includes construction management, inspection of the <br />