Laserfiche WebLink
<br />AUGUST 9, 2004 <br />PAGE20F2 <br /> <br />5. Prior to issuance of a grading permit I the applicant shall <br />prepare an NPDES post-construction storm water management plan <br />per Orange County Drainage Area Management Plan (DAMP) that <br />includes all structural and non-structural Best Management <br />Practices. <br /> <br />a. Submit and have approved a surface drainage/utility plan <br />that includes all Structural Best Management Practices. <br /> <br />b. Provide two copies of the Water Quality Management Plan <br />that includes a description of all-applicable Structural <br />and Non-Structural Best Management Practices I which may <br />apply to this project. <br /> <br />6. Building plans shall reflect that the proposed project is <br />fitted with a grease interceptor to the size and capacity as <br />designated by the Building Safety Division of the City of <br />Santa Ana to mitigate impacts on the local sanitary sewer <br />system and regional water quality. Such grease interceptor <br />shall be regularly maintained so as to remain fully <br />functional. <br /> <br />B. Police Department <br /> <br />1. Cash register must be visible from the street at all times and <br />shall not be obstructed at any time by temporary or permanent <br />signage. <br /> <br />2. Window displays must be kept to a minimum for maximum <br />visibility and shall not exceed 25 percent of window coverage. <br /> <br />3. Window display and racks must be kept to a maximum height of <br />three feet including merchandise. <br /> <br />4. All payphones shall be located inside the premises and <br />restricted to outgoing calls only. <br /> <br />758-47 <br /> <br />