Laserfiche WebLink
<br />MA YOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Brett E. Franklin <br />COUNCILMEMBERS <br />Claudia C. Alvarez <br />Lisa B ist <br />Alberta D. Christy <br />Mike Garcia <br />Jose Solorio <br /> <br />~ <br />~ <br />CITY OF SANTA ANA <br /> <br />CITY MANAGER <br />David N, Ream <br />CITY ATTORNEY <br />Joseph W, Fletcher <br />CLERK OF THE COUNCIL <br />Patricia E, Healy <br /> <br />PLANNING & BUILDING AGENCY <br />20 Civic Center Plaza (M-201 <br />P.O. BOX 1988 . Santa Ana, California 92702 <br />www.santa-ana,org <br /> <br /> <br />Pursuant to the Procedures of the City of Santa Ana for implementation of the Califomia <br />Environmental Quality Act, the Environmental Evaluator has completed an Initial Study for <br />the project described below: <br /> <br />Project Number: <br /> <br />2004-32 <br /> <br />Applicant: <br /> <br />Red Mountain retail Group <br /> <br />Project Location I Address: 2701 North Bristol Street <br /> <br />Project Title I Description: The proposed project is a request for a conditional use <br />permit to allow the construction of a commercial building <br />with a Starbuck Coffee Shop with drive through window <br />service. Additionally, the project involves a request to allow <br />the reduction of the off-street parking requirement. <br /> <br />And does hereby find: <br /> <br />That although the proposed project could have a significant effect on the <br />environment, there will not be a significant effect in this case because of revisions to <br />the project and mitigation measures placed on the project, and agreed to by the <br />applicant, reduce each impact to below a level of significance. <br /> <br />Signature: <br /> <br />~--if" <br /> <br />Environmental Coordinator <br /> <br /> <br />This determination is not final until adopted by the decision-making body or administrative <br />official, and a Notice of Determination is filed. <br /> <br />Page 2 of32 <br /> <br />758-51 <br /> <br />CS 606-2 <br />