Laserfiche WebLink
<br />surfaces tributary to the street. Since nuisance flows <br />usually originates in the street, they commonly contain <br />many common pollutants found in streets such as oil/grease, <br />metals and sediment. Because the proposed project involves <br />an auto servicing/auto repair use there is a higher <br />potential for water quality impacts associated with <br />substances such as oil and grease. To minimize the <br />potential for degraded surface water impacts generated from <br />the proposed project, the all entrances of all service bays <br />perimeter of the garage area shall have a raised curb to <br />retain surface water runoff on the project site. <br />Additionally, during construction operations Best <br />Management Practices would be employed to minimize <br />potential construction-related water quality impacts. <br /> <br />Mitigation Measure <br /> <br />· Building plans for the proposed proj ect shall reflect <br />a raised curb around the perimeter of the garage area <br />to retain surface water runoff onsite. <br /> <br />. <br /> <br />The service area shall be constructed to drain <br />underground clarifier/sump/tank equipped with a <br />off valve that can stop further drainage of <br />water or spilled material into the street and <br />drain system. <br /> <br />to an <br />shut- <br />storm <br />storm <br /> <br />· Construction plans for the proposed project shall <br />reflect that Best Management Practices would be <br />employed for all exterior construction activities. <br /> <br />B. Substantially deplete groundwater supplies or <br />interfere substantially with groundwater recharge such <br />that there would be a net deficit in aquifer volume or <br />a lowering of the local groundwater table level. <br /> <br />Q. Have a potentially significant adverse impact on <br />groundwater quality? <br /> <br />No Impact <br /> <br />Construction operations for the proposed project would not <br />require de-watering activities. The long-term operation of <br />the proposed project would not have any impact on <br />groundwater supplies. Additionally, the proposed project <br />would not interfere with ground water recharge because the <br /> <br />13 <br /> <br />75A~2'9 <br />