Laserfiche WebLink
<br />. <br /> <br />CVBERNET <br />Con!iuh:lng Inc. <br /> <br />SCADA SYSTEMS, COMMUNICATIONS & SOFTWARE ENGINEERING <br /> <br />September 15, 2004 <br />(Revised September 16, 2004) <br /> <br />Nabil B. Saba, PE <br />SeniJr Civil Engineer <br />City of Santa Ana <br />220 South Daisy Avenue <br />Santa Ana, CA 92703 <br />714-647-3378 <br />nsaba@si.santa-ana.ca.us <br /> <br />Subject: <br /> <br />Proposal to Provide Professional Engineering Services to Prepare Functional <br />Specifications for a Security Management System <br /> <br />Dear Mr. Saba, <br /> <br />It was a pleasure to meet with you and Mr. Green to discuss City of Santa Ana's (the City) needs related to <br />this subject. CyberNet Consulting, Inc. (CyberNet) proposes the following approach leading to the design <br />and advertisement for construction of a Security Management System (SMS) to initially include the 7 MG <br />West Reservoir, and two associated Well Sites. It is envisioned that ultimately up to 35 facilities may be <br />included in the SMS. <br /> <br />PROJECT OBJECTIVES <br /> <br />The project objectives include the following: <br />. Intrusion monitoring and alarming capability at West Reservoir and 2 adjacent well sites; <br />. Video monitoring and unauthorized entry / motion detection capability at the sites listed above; <br />. Alarm notification at the existing SCADA control room as well as paging capability; <br />. Alarm notification to the SCADA system (to be incorporated into the SCADA system by others); <br />. SMS configuration and monitoring capability through a PC based central system located at the <br />existing SCADA control room; <br />. Wireless communications between the well sites and the reservoir sites and the central SMS <br />computer located at the existing SCADA control room. <br /> <br />A wireless communications field survey is assumed to have been conducted, the results of which is to be <br />made available by the City for inclusion in the Specifications as an appendix. <br /> <br />SCOPE OF WORK <br /> <br />PART A - PREPARE FUNCTIONAL DESIGN SPECIFICA TIONS <br /> <br />Task 1 -Meet with the City staff to discuss the overall project goals and priorities <br />CyberNet will meet with the City staff to review and discuss project goals and priorities. <br /> <br />Task 2 - Review available as-built drawings from the City to verify existing conditions and <br />determine interfacing requirements <br />Review available as-builts for project sites as applicable to this project. <br /> <br />Corporate Office - San Diego <br />3934 Murphy Canyon Road, Ste B202 <br />San Diego, CA 92123 <br />858/492-2999 <br /> <br />Northern California <br />1499 Bayshore Blvd., Ste 139 <br />Burlingame, CA 94010 <br />650/888-5000 <br /> <br />Inland Empire / High Desert <br />11665 Winterhawk Way <br />Apple Valley, CA 92308-7786 <br />760/486-4067 <br /> <br />www.cybernet-consulting.com <br /> <br />800/482-9237 <br /> <br />info@cybernet-consulting.com <br /> <br />EXHIBIT <br /> <br />A <br />