c) Meet with City Staff to review Engineer's assessments, recommended approach to the final <br />design, schedule and logistics. Communication is critical at this point to minimize future design <br />revisions. All parties need to buy in to the logistics and recommended approach so that we can be <br />clear on the path forward. Based on agreed program, Engineer shall proceed with design. <br />d) The Engineer shall prepare preliminary construction documents and submit six sets of plans to the <br />City for review and comments. The Engineer shall pay for cost of reproduction of all submittals <br />prior to approval. The construction documents shall be drawn on 24" by 36" sheets. Each set of <br />drawings shall include: <br />I. Site plan <br />Ii. Demolition plan <br />III. Floor plan and details <br />IV. On -drawing specifications <br />e) Obtain City's design development review comments and additional requirements from appropriate <br />City departments, and a notice to proceed to construction documents. <br />3. Task 3 -Construction Documents: <br />a) Meet with City Staff to go over City's design development review comments and additional <br />requirements, and to obtain any other last minute requirements prior to preparing the final <br />construction documents. . <br />b) Prepare final plans with specifications for City approval and for bid. Corrections shall be made as <br />required until plans are approved by the City of Santa Ana Building and Safety Department. <br />c) Prepare final cost estimate. Dahl, Taylor & Associates understand the importance of a good cost <br />estimate. As a practice, we use equipment costs from local vendors, obtain local contractors' <br />prices and markups, review our cost estimates against actual construction costs of recently <br />completed projects, and have local contractors to give us their second opinions. Therefore, we <br />are confident that our cost estimates will reflect the probable costs in Southern California market. <br />d) Provide signed originals of all approved drawings and CAD file in a format to be determined to the <br />City together with all bid documents. Our engineers in responsible charge will sign their respective <br />drawings. All original bid documents shall become the property of the City of Santa Ana provided <br />that the City will not use the documents for other applications and construction without obtaining <br />approval from the Engineer. <br />e) Provide one (1) Project Data Book for each station which includes: <br />• 11" x 17" drawings issued for construction <br />• Material list <br />• Project estimate <br />• Lumen Method calculations <br />• Copies of correspondence between vendor, City, and 3rd parties (i.e. Edison) <br />SCHEDULE <br />Task 1 — Program Analysis <br />2 weeks <br />2. City's Review and Comments '2 weeks <br />3. Task 2 — Design Development 4 weeks <br />H <br />