r <br />M <br />4. City's Design Development Review & Comments <br />3 weeks <br />5. Task 3 — Construction Documents <br />6 weeks <br />6. Plan Check Review <br />6 weeks <br />7. City's Construction Documents Review & Comments <br />3 weeks <br />(Concurrent with Item 6 — Plan Check Review) <br />8. Engineer's Incorporation of Final Comments <br />2 weeks <br />9. City's Preparation of Bid Package <br />4 weeks <br />10. Bid Advertisement <br />4 weeks <br />11. Bidding <br />5 weeks <br />12. Construction Contract Award <br />6 weeks <br />13. Construction Period <br />30 weeks <br />14. Project Closeout <br />4 weeks <br />Therefore, the design and review period is 17 weeks; the plan check period is 8 weeks; the <br />bidding period including preparation of bid package, bid advertisement and bidding is 13 weeks; <br />and the construction period including construction contract award is <br />40 weeks. Hence, the total <br />time is 78 weeks. <br />If the City of Santa Ana wishes to reduce the overall time proposed, <br />the number of weeks for <br />several items above can be reduced to preferable periods. <br />5 <br />