My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING 3 - 2004
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING 3 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 1:55:19 PM
Creation date
12/8/2004 4:48:26 PM
Metadata
Fields
Template:
Contracts
Company Name
Pacific Coast Cabling
Contract #
A-2004-189
Agency
Finance & Management Services
Council Approval Date
9/20/2004
Expiration Date
9/21/2007
Insurance Exp Date
1/1/2008
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />transportation required for the work to performed safely and satisfactorily. <br /> <br />2.3.2. Provide all work necessary to complete the project safely and <br />satisfactorily, whether or not it is specifically spelled out in the scope of <br />work. <br /> <br />2.3.3. Coordinate your installation work with other trades: <br /> <br />2.3.3.1.Assume responsibility for any cooperative work that must be altered <br />due to lack of proper supervision of failure to make proper provision in <br />time. <br /> <br />2.3.3.2.Perform alterations, based upon parameters specified herein, or based <br />upon industry standards, whichever is to the satisfaction of the <br />Telecommunications Coordinator, and pay all costs. <br /> <br />2.3.4. Resolve code conflicts prior to installation. Remove and replace all work <br />conflicting with codes or, in the Telecommunications Coordinator's opinion, <br />not meeting specified requirements, and pay all costs. <br /> <br />2.3.5. Permits: Obtain permits and inspections, and pay all fees. Deliver all <br />certificates of inspection to the Telecommunications Coordinator. <br /> <br />2.3.6. Guarding: <br /> <br />2.3.6.1.Provide protection for hazardous conditions. <br /> <br />2.3.6.2.Provide industrial accident and warning signs per ANSI and OSHA. <br /> <br />2.3.6.3.Erect and maintain suitable barriers, protective devices, lights, and <br />warning signs for the protection of the public and employees from the <br />work being undertaken. <br /> <br />2.3.6.4.Conform to applicable safety regulations, including those of the <br />Telecommunications Coordinator. <br /> <br />2.3.7. Erection and installation techniques, including structural adequacy and <br />bracing suitable for stability and/or seismic Zone Four conditions. <br /> <br />2.3.8. No changes or additions shall be made to the scope of work of any given <br />project except by written, fully documented, and cost approved change <br />order. If the vendor without an approved change order performs changes or <br />additions, the vendor assumes full responsibility for any consequences of <br />changes or additions so made and must bear all costs associated with said <br />changes or additions. <br /> <br />Page 11 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.