My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING 3 - 2004
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING 3 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 1:55:19 PM
Creation date
12/8/2004 4:48:26 PM
Metadata
Fields
Template:
Contracts
Company Name
Pacific Coast Cabling
Contract #
A-2004-189
Agency
Finance & Management Services
Council Approval Date
9/20/2004
Expiration Date
9/21/2007
Insurance Exp Date
1/1/2008
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1.13.3. Equipment rack cable management systems: CPI (Chatsworth Products, <br />Inc.). <br /> <br />1.13.4. Open-top, ceiling-distribution, cable-support hardware: manufacturer I <br />supplier of choice. <br /> <br />1.13.5. Cable tray: manufacturer I supplier of choice. <br /> <br />1.13.6. Fire stop caulking compound: 3M, Tremco, Manville, or equal. <br /> <br />2. EXECUTION <br /> <br />2.1. SITE CONDITIONS <br /> <br />2.1.1. Examine any available drawings and specifications, survey the existing <br />conditions, and include all necessary allowances in the bid proposal. <br /> <br />2.1.2. Resolve all conflicts with code requirements and site conditions. <br /> <br />2.1.3. Verify the locations of all existing utilities prior to installation and protect <br />them from damage. <br /> <br />2.1.4. Pay all costs incurred due to damage of existing utilities or other facilities. <br /> <br />2.2. LOCATIONS <br /> <br />2.2.1. Verify all drawings and other informational document information against <br />field conditions. <br /> <br />2.2.2. When changes in indicated locations or arrangements are necessary due <br />to existing conditions, make such changes at no cost to the City. Provided <br />that change is ordered before installation, that the length of cable runs are <br />not revised by more than ten percent, and change does not require <br />additional cable runs, cable termination hardware, cable management <br />hardware, or racking hardware. <br /> <br />2.2.3. Bring discrepancies between different drawings, between drawings and <br />actual field conditions, or between drawings and specifications, promptly to <br />the attention of the Telecommunications Coordinator for decision, and stop <br />pertinent work subject to resolution of the conflict. <br /> <br />2.3. RESPONSIBILITIES OF VENDOR <br /> <br />2.3.1. Include all labor, material, associated tools, test equipment and <br /> <br />Page 10 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.