My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEST COAST ARBORISTS 1 -2004
Clerk
>
Contracts / Agreements
>
W
>
WEST COAST ARBORISTS 1 -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 10:26:27 AM
Creation date
12/13/2004 1:41:16 PM
Metadata
Fields
Template:
Contracts
Company Name
West Coast Arborists
Contract #
A-2004-116
Agency
Public Works
Council Approval Date
6/21/2004
Expiration Date
6/30/2009
Insurance Exp Date
7/1/2012
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
improvements are removed or damaged, other than those designed for removal, then such <br />improvements shall be replaced in kind at the Contractor's expense within 48 hours. <br />TRAFFIC CONTROL <br />The Contractor shall conduct all work in a manner that will insure continuous traffic flow on the <br />street at all times. In situations here it is necessary to restrict traffic flow, the Contractor will <br />contact the City Inspector for directions. <br />K. MISCELLANEOUS TRAFFIC DEVICES <br />Signs used for handling traffic during the course of this project shall be in accordance with the <br />"Work Area Traffic Control Handbook" (WATCH) published by Building News, Inc., and made <br />a part of these detailed specifications. The method in which signs, barriers and other <br />miscellaneous traffic devices are used during construction shall be in accordance with the <br />publications mentioned. A copy of said publication is on file in the Public Works Agency. All <br />signs shall be illuminated or reflectorized when they are used during hours of darkness. All <br />cones, pylons, barricades, or posts used in the diversion of traffic shall be provided with flashers, <br />or other satisfactory illumination if in place during hours of darkness. <br />L. PAYMENT FOR TRAFFIC CONTROL <br />Payment for maintenance of traffic and detours and for conforming to all the provisions of these <br />specifications, unless otherwise specified and itemized in the bid schedule, shall be considered to <br />be included in the contract unit or lump sum prices paid for various items of work wherein <br />maintenance of traffic and detours is required, and not additional allowance will be made <br />therefore. <br />M. WORK BY CITY FORCES BECAUSE OF NONCONFORMACE TO CONTRACT <br />Should the contractor fail to correct deficiencies or public nuisances that have been created <br />because of this operation, then these will be considered to be of an emergency nature and cause <br />for the City to move in on the project to make corrective work. Such work will be done on a <br />force account basis with an additional callout charge of $200.00 for each callout. It also should <br />be noted that there is a minimum of a two -hour charge for labor on any callout. <br />N. EQUIPMENT PROHIBITION <br />No tractor with scraper allowed on street pavement without prior approval by the City Tree <br />Maintenance Supervisor. <br />O. TREE PLANTING <br />All trees and material will be checked by City Inspector prior to and following <br />tree planting. All trees to be planted per Standard 1124 or 1124B. (See <br />Attachments I & 2). All trees planted per Standard 1124B will have root guards <br />placed at the base of the tree parallel to the curb and sidewalk and have a water <br />basin constructed as per attached said standards. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.