My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEST COAST ARBORISTS 1 -2004
Clerk
>
Contracts / Agreements
>
W
>
WEST COAST ARBORISTS 1 -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 10:26:27 AM
Creation date
12/13/2004 1:41:16 PM
Metadata
Fields
Template:
Contracts
Company Name
West Coast Arborists
Contract #
A-2004-116
Agency
Public Works
Council Approval Date
6/21/2004
Expiration Date
6/30/2009
Insurance Exp Date
7/1/2012
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. No climbing spurs, or hooks will be used by anyone employed for such trimming. <br />No tractors or scrapers will be permitted on City streets for lading brush or logs <br />unless Inspector permits. <br />6. The Contract shall provide daily log sheets of work completed to the Public <br />Works Agency. <br />The Contractor shall be given forty five (45) working days to complete each <br />pruning list issued by the Public Works Agency. <br />8. Failure of the Contractor to complete the Work within the time allowed will result <br />in damages being sustained by the Agency. For each consecutive working day in <br />excess of the time specified for completion of the Work, the Contractor shall pay <br />to the Agency, or have withheld from monies due it, the sum of $200 per day, <br />unless otherwise provided in the Specifications. <br />Upon completion of the trimming, the Contractor shall provide the Agency with a report <br />showing the date of each tree trimmed by address. <br />Q. TREE STUMP REMOVAL <br />This project calls for the complete removal of tree and stump at locations <br />designated by the Public works Agency. The main stump to be ground down <br />eighteen (18) inches and ALL surface roots to be ground down ten (10) inches. <br />All trees and stumps will be measured at four (4) inches above soil grade. <br />2. Backfill material shall be compacted to provide for minimal settling. It shall <br />consist of an equal mixture of soil and stumped material which shall be two (2) <br />inches above grade to provide for any soil settlement. No stump holes will be <br />left overnight. <br />3. The Contractor shall provide daily log sheets of work completed to the Public <br />Works Agency. <br />4. The Contractor shall be given forty -five (45) working days to complete each tree <br />and stump removal list issued by the Public Works Agency. <br />Failure of the Contractor to complete the work within the time allowed will result <br />in damages being sustained by the Public Works Agency. For each consecutive <br />working day in excess of the time specified for completion of the Work, the <br />Contractor shall pay to the Public Works Agency, or have withheld from monies <br />due it, the sum of $200 per day, unless otherwise provided in the Specifications. <br />R. DISPOSAL OF MATERIALS <br />All tree branches produced as a result of the Contractor's operations under this <br />contract will be reduced, reused, recycled, and/or transformed. Documentation such <br />as bills of lading will be required as proof of final disposal. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.