My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 2775 N. MAIN ST.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/07/2005
>
75B - 2775 N. MAIN ST.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:59:09 PM
Creation date
2/2/2005 1:29:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
2/7/2005
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1. All landscaping shall be maintained in a healthy and attractive <br />condition. Maintenance should be carried out in accordance with <br />established horticulture practices. Irrigation problems must be <br />resolved promptly to assure plant survival. Prior to planting soil <br />must be property prepared to assure plant survival. <br /> <br />2. Textured concrete paving in the short term parking will be sealed <br />f-or ease of maintenance and protection from vehiele oil leaks. <br /> <br />3. Planter areas in the slab over underground parking will be sealed <br />for water proofing with asphalt coating and a liner. <br /> <br />14 No use of Queen Palms for the project interior areas. <br /> <br />~. No electrical, mechanical or plumbing apparatus shall be located in <br />required setback areas. <br /> <br />6. Vine poekets and/or fenestration shall be provided at all tm-ee story <br />walls of single family attached housing to minimize the blank <br />garage walls. <br /> <br />1+. All landscaped areas shall be irrigated using an automatic <br />irrigation system. A schematic irrigation system employing pop- <br />up type sprinkler heads, backflow preventer, automatic time clock, <br />and where applicable, a quick coupler adjacent to all trash <br />enclosures shall be provided. <br /> <br />1&. On site trees will be spaced in coordination with required existing <br />parkway trees. <br /> <br />19. The development will provide double-staking for all newly planted <br />trees (on and off site). <br /> <br />1M. Only low shrubs and/or ground cover shall be planted in landscape <br />areas used for parking overhang. <br /> <br />F. Planting and landscape walls shall be used to screen all <br />appurtenances, such as transformers, meters, trash enclosures, air <br />conditioning units, etc. <br /> <br />~. Phasing of landscape implementation shall be compatible with the <br />construction schedule for the entire project, as per the approved <br />site plan. <br /> <br />42 <br /> <br />758-343 <br />
The URL can be used to link to this page
Your browser does not support the video tag.