Laserfiche WebLink
<br />~. All fountains and water features throughout the project shall be <br />plumbed for non-potable "gray water" for conversion when such <br />water is available. <br /> <br />B+4. A xeriphytic landscaping materials and irrigation design shall be <br />used for this project. In addition, the plant palette shall mirror that <br />of Santiago Park, where the park is adjacent to the project. <br /> <br />43 <br />758-344 <br />