My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2671
Clerk
>
Ordinances
>
2000 - 2010 (NS-2416-2812)
>
2004 (NS-2641 - NS-2673)
>
NS-2671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:01:35 PM
Creation date
2/14/2005 9:35:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2671
Date
12/20/2004
Document Relationships
NS-2649 Active
(Supersedes)
Path:
\Ordinances\2000 - 2010 (NS-2416-2812)\2004 (NS-2641 - NS-2673)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Midtown Specific Plan <br /> <br />PLANNING AREA ACCESS <br /> <br />At present, primary east.west access to the Midtown planning area is <br />via First Street on the south and Seventeenth Street on the north. <br />Main Street and Broadway provide primary arterial access to the <br />downtown/civic center complex from the north and the south. <br /> <br />An "enhanced intersection" has been designated for Seventeenth <br />Street and Main Stree~ and Seventeenth and Broadway, through <br />General Plan Amendment No. 92.9. The intersection improvements <br />will include increasing the number or "tanes at the inlersection <br />approach to increase capacity. The exact configuration of the <br />intersection will be based on detailed traffic and land use analysis. <br /> <br />Freeway access to the Midtown area is provided by Interslate 5, <br />either from the Main Street Interchange to the north, or the <br />Seventeenth Street inlerchange to the northeast. Once <br />improvements are complete, access to the planning area from the <br />southeast will be provided by the FirsVFourth Street interchange. <br /> <br />Even though competing employment centers have more convenient <br />freeway access, the Midtown area benefits directly from its easy <br />mass transit access. Bus access to the planning area is direct due <br />mostly to the area's location near the Civic Center complex and the <br />location of OCTA's main transit terminal at Broadway and Fifth <br />Streel. Commuter rail access is currently being provided at the <br />Sanla Ana Regional Transportation Center, and bus service Is <br />availabie for direct access to the Midtown area. As described above, <br />bolh METROLlNK and fixed guideway services will be available in <br />the future. The implication for the planning area Is that in the future <br />Its accessibility by rapid transit will be excellenl, which over the long <br />term will increase the attractiveness of the area as a business <br />location, The planning area will also increasingiy benefit adjacent <br />residential neighborhoods with its convenience to jobs, shopping and <br />regional transit <br /> <br />VISUAL STRENGIHS AND WEAKNESSES <br /> <br />An inventory or Midtown's visual strengths and weaknesses is <br />documenled on Exhibit 4, Visual Strengths and Weaknesses. The <br />following process was employed for this visual assessmenl. <br /> <br />The photographic inventory, building survey, and physical <br />constraints mapping of Midlown conducted for Ihe design <br />charette were reviewed 10 gain familiarity with the planning area. <br /> <br />. <br /> <br />A walking and driving survey was conducted by the consulting <br />team to confirm the inventory dala. <br /> <br />, . <br /> <br />Chapter 2: Existing Conditions <br /> <br />Ordinance NS-2671 <br />a <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.