My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />~. <br /> <br />Task-4.06 Segment 6 Irvine SpectrumfIransportation Center <br />. Irvine Spectrum; Plan & Profile will be based on PE 4. ITom San Diego Creek/Sand Canyon <br />to Irvine Transportation Center. '" <br /> <br />Task 4.07 Segment Studies <br />. CONSULTANT will produce a complete project definition following these proposed basic <br />steps: " <br />);- Definition ofIssues <br />);- CenterLine Summit No. I <br />);- Public Route Segment Meetings <br />);- Technical Studies <br />);- Meetings with AUTHORlTY Committees (Transit Planning and Operations, Policy <br />Working Group, City Mangers, and Technical Steering Committee) <br />);- Milestone Reports presenting the results of the studies <br />);- AUTHORITY Hearings and Decisions <br />. CONSULTANT anticipates both alignment and station area planning to be required in each <br />of the six route segments, as outlined in this section. Further engineering and architectural <br />work would be carried out under CONSULTANT Schedule of Values TasKs 4.01 through <br />4.06 and PE 9., respectively, after the project definition phase is complete. <br />. The starting point for these special studies will be the Locally Preferred Alternative (LP A), <br />selected by AUTHORITY Board on October 22, 2001 and documented in the Milestone 7 <br />Report. <br /> <br />-.-. <br />'. , <br /> <br />Segment Studies, Schedule of Values Task 4.07, is broken out as sub-tasks in <br />paragraphs as they were presented in CONSULTANT's technical proposal. <br /> <br />the following <br /> <br />Task 4.07.01 Segment 1 - Central Santa Ana , <br />The alignment and station locations require further study to refine the alignment proposed by the <br />City and included in the selected LPA. The work will focus on: <br /> <br />. <br /> <br />Analysis of up to three (3) alternative configurations for the one-way rail couplet in <br />downtown Santa Ana. The analysis would consider transit operations, traffic, c'osts, <br />neighborhood fit, and new demand modeling to test one or two configurations. ' <br />Station locations and station area planning for the Santa Ana Regional Transportation <br />Center, Santa Ana Downtown (Main Street) and Civic Center (Flower Street) stations. <br />Analysis of alternative configurations at Bristol Street/Santa Ana Boulevard, including <br />a potential northern extension to Santa Ana College and accommodation of future <br />extensions to the west. <br /> <br />. <br /> <br />. <br /> <br />18 <br /> <br /><0-"" <br /> <br /> <br />Deliverables: <br />. Draft and Final Milestone Reports for Route Alignment - Segment 1 <br />Final <br />. Milestone Reports for Stations ~ Segment I. <br />. Updated plan and profile of the LP A within this segment. <br /> <br />and Draft and <br /> <br /> <br />~ - ..~, > <br /> <br />: ~;;;"._.~..- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.