My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />top 'of the low rail of The CenterLine Project tracks. Mathematized vertical geometry will show <br />pertinent vertical curve data including point of vertical curve, point of intersection, and point of <br />vertical tangent. Changes to existing grade will be shown in both plan and profile. ,", <br /> <br />Cross-sections will also be developed as needed to show the relationship of the alignment to any <br />special adjacency, for example, railroad embankments; utilities, overpasses, and restricted street <br />~~: ' <br /> <br />Deliverables: The plan and profile drawing end product will be as follows: <br /> <br />. <br /> <br />A complete set of plans and profile drawings for the Preliminary Engineering work, <br />reproduced on mylar at a scale of 1"=40' for plans and 1"=10' for profiles and digitized <br />for further use in CADD design. <br /> <br />The following paragraphs describes in greater detail the work scope that resulted from'1he <br />CONSULTANT's input during negotiations of the PE consulting services contract. <br /> <br />The following clarifications are included as part of the CONSULTANT's Schedule of Values: <br /> <br />. <br /> <br />Where the alignment is aerial in the streets, the CONSULTANT will develop two plan & <br />profile drawings, one on the top of rail and one at street level. <br />This task assumes all current alignment issues are resolved during months 0-6. <br />This task will be carried out during months 1-18. <br /> <br />. <br /> <br />. <br /> <br />This PE 4. scope of work task will be shown as the following tasks in the CONSULTANT's <br />Schedule of Values: <br /> <br />Task 4.01 Segment 1 Central Santa Ana , <br />. Plan & Profile development will be based on PE 4. from Santa Ana Transportation Center to <br />BristollFirst with an option to Santa Ana College. <br /> <br />Task 4.02 Segment 2 Bristol Street <br />. Plan & Profile development will be based on PE 4. from FirstlBristol (with an option to Santa <br />Ana College), to Bristol/Sunflower. <br /> <br />Task 4.03 Segment 3 Costa Mesa <br />0 Plan & Profile will be based on PE 4. from Bristol/Sunflower through Anton to Main St. and <br />the SR-55 Freeway. <br /> <br />Task 4.04 Segment 4 Irvine Business Center/Airport <br />. Plan & Profile will be based on PE 4. from SR 55IMain St. to San Diego CreeklMichelson <br />with option to UCI Campus, <br /> <br />Task 4,05 Segment 5 San Diego Creek <br />. San Diego Creek Corridor; Plan & Profile will be based on PE 4. from Michelson/San Diego <br />Creek to San Diego Creek/Sand Canyon, <br /> <br />17 <br /> <br />~_c <br /> <br />'.- <br /> <br />- <br />---- <br /> <br />(jlJ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.