Laserfiche WebLink
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />.~ <br />-~ <br /> <br />defined elsewhere in this document. The general <br />elevation and cross-section views of the stations. <br />This task will be completed within months 6-18. <br /> <br />structural plans will show the plan, <br /> <br />. <br /> <br />Task 5.10 Freeway Crossings <br />. Subsequent to Schedule of Values Tasks 5.02 and 5.03, and after the Authority selects a <br />preferred design by the end of month six (6), the CONSULTANT will develop the bridge <br />general plans for portions of viaducts crossing Caltrans Right-of-Way, at SR-55, SR-405 <br />(twice), SR-133, and 1-5. The bridge general plans are as described above in the Clarification <br />of Schedule of Values Task 5.04. <br />. In addition to the bridge general plan, the CONSULTANT will prepare, for the purpose of <br />obtaining Caltrans' approval for the structure type at each freeway crossing, a bridge type <br />selection memorandum, a vicinity map, and a general plan estimate. The CONSULTANT <br />will attend a type selection meeting at Caltrans' Office of Specially Funded Projects (OSFP) <br />to discuss the specifics of the structure type. The type selection meeting will lead 'to' <br />Caltrans' structure type approval of the freeway crossings. - <br />. The CONSULTANT will prepare a preliminary engineering evaluation of the existing <br />stmctures that are being impacted by the aerial structure. A bridge evaluation report will be <br />prepared for said stmctures, showing the upgrade or retrofit measures needed as a result of <br />such impact. <br />0 This task will be completed within months 6-18. <br /> <br />Task 5.11 Intersection Special Stmctures <br />. Subsequent to Schedule of Values Tasks 5.02 and 5.03, and after the Authority selects a <br />preferred design by the end of month six (6), the CONSULTANT will develop the <br />preliminary stmctural plans for each type of the selected intersection stmcture(s) to be used <br />within the street intersections of the above described six (6) segments. <br />. This task will be completed within months 6-18. <br /> <br />Task 5.12 Maintenance Shop <br />. CONSULTANT will provide structural support and preliminary structural drawings of the <br />CMF buildings under this task. <br />0 This task will be completed within months 6-18. <br /> <br />Task 5.13 Miscellaneous Structures <br />. The C00!SUL T ANT will evaluate up to three (3) possible design options for the retaining <br />wall stmctures, For each option, a general plan showing plan and elevation views and a <br />typical section will be prepared, A probable cost will be determined for each alternative. <br />This effort will be performed within the first six (6) months period. <br />. After the Authority selects a preferred design by the end of month six (6), the <br />CONSULTANT will develop preliminary standard structural plans of the retaining walls to <br />be used in the final design, <br />. In addition to the retaining walls, the CONSULTANT will prepare the preliminary <br />engineering for miscellaneous drainage structures required by the project under this task. <br />This effort will be performed within months 6-18, <br /> <br />25 <br /> <br />6'-.). <br /> <br /> <br />~ "c'1'-.."co---"" <br /> <br />, ' <br />