Laserfiche WebLink
<br />AGREEMENT NO. C.2.0896 <br /> <br /> <br />1.2.16 NOI/NOP is defined as the Notice of IntenVNotice of Preparation which is <br />the 'formal document(s) notifying all public agencies, interest groups, and interested <br />parties of the intent of the Authority to prepare a FEIS/EIR. <br /> <br />1.2.17 Participatinq Cities is defined as those cities in the current LPA, which are, <br />Santa Ana, Costa Mesa, and Irvine. <br /> <br />1.2.18 Polic Workin Grou PWG is defined as the organization composed of <br />elected officials from each City of The Centerline LPA, and members of the OCTA <br />Board, who will be responsible as the communication link between the OCTA Board and <br />the City Councils. <br /> <br />1.2.19 Prelimina En ineerin PE is defined as the work necessary to bring the <br />alignment, elevation, technology, and station locations of The Centerline light rail <br />system to the 30 percent design level so that the FEIS/EIR work can be completed. " <br /> <br />1.2.20 Rail Station is defined as the location(s) where The Centerline light rail <br />system will stop at intervals to allow for passenger boarding and exiting including the <br />facilities specifically required for passengers, buses, autos, and bicycles to access the <br />site. <br /> <br />1.2.21 Rail Station Area is defined as the area extending approximately one- <br />quarter of a mile from the centroid of each Centerline Rail Station. <br /> <br />1.2.22 Rail Station Area Planninq Documents are defined as the comprehensive <br />land use and development plans for The Centerline light rail Station Areas. <br /> <br />1.2.23 Rearranqement is defined as the alteration, removal, replacement, <br />reconstruction, support, or relocation of a Conflicting Facility or portion thereof, whether <br />permanent or temporary. <br /> <br />, ' 1.2.24 Substitute Facility is defined as a temporary or permanent Facility which is <br />equal, in terms of service capacity, to the corresponding Conflicting Facility that requires <br />Rearrangement. <br /> <br />1.2.25 Technical Steerin Grou s SG is defined as the organization <br />composed of the designees of the Authority and participating cities from City Land <br />Use/Planning, Engineering/Traffic and RedevelopmenVEconomic Development <br />departments, which are responsible for providing technical input and consensus for the <br />analysis and design process, linkage to work being undertaken by each city, and inter- <br />agency communications and coordination. <br /> <br />1.2.26 Transit-Oriented Develo ment TOD is defined as the public and private <br />sector facilities and investments planned and constructed in transit corridors which form <br />a linkage between land use and transit services to enhance urban living, the economy, <br />and the environment while increasing transit ridership. <br /> <br />4 <br />