My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT NO. C.2.0896 <br /> <br /> <br />1.2.6 Cit Mana ers Grou CMG is defined as the organization composed of <br />the City Managers of the participating cities on the Locally Preferred Alternative (LPA), <br />and the OCTA CEO, or his/her designee, which is responsible for the inter-agency <br />coordination at the management level and the oversight of technical work related to The <br />Centerline light rail system. <br /> <br />1.2.7 City Representative is defined as City Manager of the City, or his/her <br />authorized representative, who has the power to conduct meetings and make approvals <br />as required by this Agreement. <br /> <br />1.2.8 Conflictinq Facility is defined as a Current Facility that is so situated as to <br />require Rearrangement in order to design, construct, and operate the Centerline light <br />rail system. <br /> <br />1.2.9 Current Facility is defined as real or personal property now or in the future <br />, , <br />to be located within The Centerline light rail system for the purpose of providing <br />transportation or transportation-related service to the public, including but not limited to <br />roadways, pipes, mains, services, meters, regulators, and any equipment, apparatus <br />and/or structure appurtenant thereto or associated therewith. <br /> <br />1.2.1 0 ~ is defined as the vertical elevation of the track in <br />relation to the surrounding landscape; the tracks may be placed at surface, may be <br />elevated, may be placed in an open cut below surface, or may be below the surface in <br />subway. <br /> <br />1.2.11 Facility is defined as a physical structure or system within a distance of Y. <br />mile of the Centerline light rail system. ' <br /> <br />1.2.12 FEIS/EIR is defined as the Final Environmental Impact Statement and <br />Environmental Impact Report that analyzes the environmental impacts of a project. The <br />FEIS/EIR is required by the National Environmental Policy Act (NEPA) and the <br />California Environmental Quality Act (CEQA) as part of a project that uses federal, <br />state, and local funds to construct and/or operate. <br /> <br />1.2.13 Joint Development is defined as a term of art for many different forms of <br />public/private sector cooperation in the development of new structures and facilities to <br />be built in and around Centerline Rail Stations and Centerline Rail Station Areas. <br /> <br />1.2.14 Locall Preferred Alternative LPA is defined as the LPA, which is the <br />preferred alignment, elevation, technology, station locations, and other components of <br />The Centerline light rail system that is established with the Cities and approved by the <br />OCT A Board of Directors. <br /> <br />1.2.15 MIS is defined as the Corridor Major Investment Study completed in June <br /> <br />1997. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.