My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A . <br /> <br />~~ <br /> <br />The following paragraphs describes in greater detail the work scope that resulted <br />CONSULTANT'S input during negotiations of the PE consulting services contract. <br /> <br />from the <br /> <br />The following clariflcations are included as part of the CONSULTANT's Schedule of Values. <br /> <br />Task 7.01 Trame Engineering Criteria <br />. Design Criteria for PE 7. scope of work. <br />. Review current AUTHORITY, Caltrans, Cities of Santa Ana, Costa Mesa & Irvine policies <br />and procedures and develop design criteria statement for the CenterLine project. As design <br />criteria is completed, submit to AUTHORITY, Cities of Santa Ana, Costa Mesa, Irvine for <br />review & comments and acceptance. Maintain the design criteria throughout development of <br />the CenterLine Project. <br /> <br />" , <br /> <br />Task 7.02 Central Santa Ana Segment <br />. From Santa Ana Regional Transportation Center to BristolfFirst. <br /> <br />Task 7.03 Bristol Street Segment <br />. From FirstlBristol, with an option to Santa Ana College, to BristoVSunflower'. <br /> <br />Task 7.04 Costa Mesa Segment <br />. From BristoVSunflower through Anton to Main Street and SR-55 Freeway. <br /> <br />Task 7.05 Irvine Bus. Centerl Airport Segment <br />. From Main Street and SR-55 Freeway to San Diego CreeklMichelson, with an option to UCI <br />Campus. <br /> <br />Task 7.06 San Diego Creek Corridor <br />. From San Diego CreeklMichelson to San Diego Creek/Sand Canyon. <br /> <br />Task 7.07 Irvine Spectnunrrransportation Center Segment <br />. From San Diego Creek/Sand Canyon to Irvine Transportation Center. <br /> <br />Task 7.08 Traf[¡c Report <br /> <br />The CONSULTANT will produce a detailed report on resolution oftraf[¡c conflicts, the "before" , <br />and "after" trafflc conditions and allocation of responsibilities effecting modifications (design <br />and constmction) and maintaining and operating new devices including interface between LRT <br />control and traffic controL The CONSULT ANT will coordinate with Cities of Santa Ana, Costa <br />Mesa and Irvine, who will provide guidelines and review and approve the preliminary <br />engineering design and drawings for trafflc signals, signs, striping, and worksite traffic control <br />plans and specifications for work within their city's right of way. <br /> <br />CONSULT ANT will coordinate and make available, as reference material, trafflc preliminary <br />design infom1ation to the FEISIEIR Consultant, who is responsible for assessing the trafflc <br />impacts and the necessary mitigation measures at each intersection along the entire LPA route, <br /> <br />29 <br /> <br />6'- ¥\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.