My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />PE 8. Preliminary Design of the Central Maintenance Facility Building(s) <br />and Yard <br /> <br />The CONSULTANT will, organize, layout, size, and locate all elements of the yards and shop <br />facilities that will service and maintain the CenterLine rail vehicles, The facility will be designed <br />to approximately the 30% level. <br /> <br />Using the Conceptual Engineering and Rail System Specifications Report, and any <br />recommendations from the Geotechnical Report, the CONSULTANT will refine the layout of the <br />Central Maintenanèe Facility (CMF) site to assure efficient handling of an initial 24-vehicle fleet <br />and accommodate additional vehicles necessary for future growth. The site selection will be <br />such as to accommodate the daily service and inspection preventative and cyclical maintenance, <br />and the heavy repairs for an eventual 80-car fleet. Building sections and certain storage tracks <br />for the eventual 80-car build out that are not needed initially will be designed in such a way that <br />they might be added later when fleet expansion is contemplated (for example, since heavy repair <br />will not be fully needed in the early years of the system, portions of those functional areas might <br />be deferred, but need to be incorporated into the ultimate design). <br /> <br />The following identified areas will be provided for in the design: <br /> <br />1. Vehicle Circulation <br />. Access tracks <br />. Train storage and manipulation tracks <br />. Departure tracks <br /> <br />2. Vehicle Servicing <br />. Exterior washing <br />. Turnaround inspection <br />. Interior cleaning <br /> <br />3. Vehicle Storage <br />. Auxiliary power <br />. Security lighting <br /> <br />4. Vehicle Maintenance <br />. Daily inspection <br />. Preventative maintenance <br />. Cyclical maintenance <br />. Component removal and repair <br />. Vehicle body repair <br />. Wheel truing and truck storage <br /> <br />5. Maintenance and Operations Support <br />. Yard control <br />. Yard administrative offices <br /> <br />30 <br /> <br />.-- <br />--~ <br /> <br /> <br />¿:;CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.