Laserfiche WebLink
Bricken abstained from voting on Items 8B, 8D, 9A, 9B, 9C, and 9D. The M~yor <br />announced that Item 18, previously noticed by the Planning Department for <br />public hearing on this date at 7:30 p.mo, would be postponed to the evening <br />session for the noticed public hearing. <br /> <br />CONSENT CALENDAR <br />STAFF RECOMMENDATIONS <br />APPROVED <br /> <br />items. <br /> <br />MOTION was made by Luxen~bourger, <br />seconded by Bricken, to approve <br />the staff recommendations on <br />the following Consent Calendar <br /> <br />AYES: <br />NOES: <br />ABSENT: <br /> <br />Bricken, Griset, Luxembourger, Markel, Serrato, Ward, Yamamoto <br />None <br />None <br /> <br />MINUTES <br /> <br />ings of May 11 and May 12, 1980. <br /> <br />Approved the Minutes of the <br />Regular Meeting of May 5, 1980, <br />and the Adjourned Regular Meet- <br /> <br />BID CALLS <br /> <br />Approved plans and specifica- <br />tions and authorized advertise- <br />ment for bids on the following: <br /> <br />SPEC 80-013 - 15-Passenger Van with Hydraulic Lift. <br /> <br />ANNUAL REQUIREMENTS - Public Works Department: <br /> <br />SPEC 80-111 <br />SPEC 80-112 <br />SPEC 80-118 <br />SPEC 80-120 <br />SPEC 80-121 <br />SPEC 80-122 <br />SPEC 80-135 <br />SPEC 80-136 <br />SPEC 80-137 <br />SPEC 80-138 <br />SPEC 80-234 <br />SPEC 80-235 <br />SPEC 80-236 <br /> <br />- Asbestos Cement Pipe <br />- Detector Check Valves <br />- Cast Iron Fittings for AC Water Pipe <br />- Gate Valves <br />- Butterfly Valves <br />- A&B Tapping Sleeves & Gate Valves <br />- A&B Fire Hydrants <br />- Cold Water Meters <br />- Domestic Cold Water Meters - Fire <br />- Cold Water Meters Compound <br />- Portland Cement Concrete <br />- Asphalt Concrete FOB Plant <br />- Trench Paving & Patching <br /> <br />PROJECT 4046 - Repair C-5-F Storm Drain Channel <br />West of Harbor Boulevard <br /> <br />CA 89 <br /> <br />BID <br /> <br />AWARDS <br /> <br />Awarded the following on basis <br />of lowest responsible and <br />responsive bidder: <br /> <br />SPEC 79-063 - Reinforce Chassis & Provide New Bodies on <br />Two Trucks - Public Works/Maintenance Services; awarded <br />to Paramount Truck Body & Equipment Co., Long Beach, in <br />the total amount of $22,978.96 for Option I plus supple- <br />mental Items 3 and 4, and delivery, less Option Item "A". <br /> <br />Rejected bid from Holmes Roofing as non-responsive, and awarded the <br />following on basis of lowest responsible and responsive bidder: <br /> <br />PROJECT 7129 - Roof Reconstruction - Library Building - <br />Public Works; awarded to Stone Roofing Co., Inc., San <br />Gabriel, in the total amount of $17,626.00. <br /> <br />Rejected bid from Bithell, Inc., as not meeting minimum requirements <br />of specifications, and awarded the following on basis of lowest <br />responsible and responsive bidder: <br /> <br />CITY COUNCIL MINUTES <br /> <br />162 MAY 19, 1980 <br /> <br /> <br />