Laserfiche WebLink
<br />. <br />. <br /> <br />analyze the planning data developed for the <br />Orange County Multimodal Transportation <br />Terminal; show the comparison of public <br />transit trips to vehicle trips for the <br />Project Area; and develop a future traffic <br />demand spider transportation network system. <br /> <br />E. <br /> <br />Conduct Circulation Analysis: <br /> <br />CONTRACTOR, using the existing data base assembled <br /> <br />in tasks A through D shall analyze the internal traffic <br /> <br />. <br /> <br />circulation for the City of Santa Ana's major arterial <br /> <br />system as it pertains to the Project Area. <br /> <br />Analysis <br /> <br />shall include determination of the level of service <br /> <br />of existing streets and intersections, operation of <br /> <br />the existing traffic control systems, access capabilities <br />to public and private parking facilities, and existing <br /> <br />traffic patterns from the Santa Ana Freeway interchanges <br /> <br />to the Civic Center. <br /> <br />CONTRACTOR shall identify the <br /> <br />possible methods of improving traffic circulation <br /> <br />for the Santa Ana Boulevard corridor between the Civic <br /> <br />Center and the Santa Ana Freeway. <br /> <br />The reports supplied <br /> <br />by the CONTRACTOR in this task shall present the base <br /> <br />data for the analysis of the present transportation <br /> <br />system, parking facilities, land uses and environmental <br /> <br />. <br /> <br />information such as air quality and noise conditions. <br /> <br />Existing traffic characteristics and roadway deficiencies <br /> <br />. <br /> <br />shall be identified along with traffic accumulation <br /> <br />problems. <br /> <br />F. <br /> <br />Test Alternative Network.: <br /> <br />CONTRACTOR shall develop three (3) alternative street <br /> <br />networks for the Study <br /> <br />Area. <br /> <br />Alternative networks <br /> <br />. <br />I <br /> <br />shall be analyzed and evaluated relative to effective- <br /> <br />ness in relieving existing traffic problems and ser- <br /> <br />ving projected travel demands. <br /> <br />This project task shall <br /> <br />utilize the results of the circulat:i."pn analysts study and <br /> <br />suggest the structuring of super blocks for the <br /> <br />Study <br /> <br />Area. <br /> <br />Innovative traffic management and <br /> <br />61.. <br /> <br />UI} s-iT <br />