Laserfiche WebLink
<br />City Place Focused Environmental Impact Report <br /> <br />Responses to Comments <br /> <br />. <br /> <br />Three 7,900 square foot restaurant pads fronting on Main Street. <br /> <br />. <br /> <br />A 25,000 square foot market <br /> <br />. <br /> <br />7,000 square feet of retail uses <br /> <br />. <br /> <br />2,000 square feet of retail or restaurant area <br /> <br />SECTION 4.0 EXISTING CONDITIONS, IMPACTS AND MITIGATION MEASURES <br /> <br />Section 4.3 Air Quality <br /> <br />Section 4.3.4,2 Sensitiye Receptors <br /> <br />The following replaces the second sentence on page 4.3.8 of the City Place EIR by reference to <br />clarify sensitive receptors near the project site. <br /> <br />Sensitive land use receptors in the vicinity of the project site include an elder care facility east of <br />tbe project site, Santiago Park and the Park Santiago Neighborhood to the south and a residential <br />condominium complex to the north ofthe site on Town and Country Road. <br /> <br />Section 4.3.8.1 Construction Phase <br /> <br />The following dust control measure bas been incorporated as mitigation AQ-5a to adhere to Rule <br />403 and new regulations which become effective after January 1,2005: <br /> <br />AO-5a After January I. 2005, no person shall conduct an active operation with a disturbed <br />surface area of five or more acres. or with a daily imoort or export of 100 cubic yards or <br />more of bulk material without utilizing at least one of the measures listed in <br />subparagraohs (d)(5)(A) through (d)(5)(E) at each vehicle egress from the site to a oaved <br />public road. <br /> <br />(A) <br /> <br />Install a Dad consisting of washed gravel (minimum-size: one inch) maintained in <br />a clean condition to a deoth of at least six inches and extending at least 30 feet <br />wide and at least 50 feet long. <br /> <br />(B) <br /> <br />Pave the surface extending at least 100 feet and at least 20 feet wide. <br /> <br />(C) <br /> <br />Utilize a wheel shaker/wheel soreading device consisting of raised dividers (rails. <br />oioe. or grates) at least 24 feet long and 10 feet wide to remove bulk material <br />fj-om tires and vehicle undercarriages before vehicles exit the site. <br />Install and utiJize a wheel washing svstem to remove bulk material fj-om tires and <br />vehicle undercarriages before vehicles exit the site. <br /> <br />(D) <br /> <br />C:\Documents and Settings\BKaufmanlLocal SettingslTemporary Internet FileslOLKB\Cily Place Council Change <br />Clarifications. doc C-6 <br />January 2005 <br />Resolution 2005-016 <br />Page 10 of 53 <br />